15-5
2) Install the new upper mount holder gasket and the upper
mount holder on the upper rubber mount with the cutouts
in the upper mount holder gasket and in the upper mount
holder toward the opposite side from the water seal
installation part.
Note the installation direction.
3) Tighten the upper rubber mount securely with the six 8 x 35
mm flange bolts.
4) Tighten the two 12 x 145 mm stud bolts on the upper
rubber mount securely with the longer threads of the stud
bolts toward the upper rubber mount side.
[2] 12 x 145 mm
STUD BOLT (2)
[3] <12 x 145 mm STUD BOLT>
[3] UPPER MOUNT
HOLDER GASKET
[2] CUTOUTS
[1]
UPPER
MOUNT
HOLDER
8 x 35 (6)
[4]
WATER SEAL
INSTALLATION
PART
[5] LONG
[4] SHORT
[1] UPPER RUBBER
MOUNT
[6]
UPPER
RUBBER
MOUNT
SIDE