100
In
tr
oduc
tion
Pr
oduc
t Description
Instruc
tions f
or use
Technica
l Inf
ormation
Insta
llation
Main
tenance
Spar
e P
ar
ts
Appendix
Con
ten
ts
Declar
ation
Oper
ation & Main
tenance Manual SpeedStile B
P DS
F1
F2
F3
F4
F1 =
5x20 10A 250V Time delay;
protection on the +42V power supply line
F2 =
5x20 2.5A 250V Time delay;
protection on the +24V not regulated circuit
F3 =
5x20 10A 250V Time delay;
protection of the supply circuit from battery
F4 =
5x20 2.5A 250V Time delay;
protection of the +24VDC towards GC01
Cables and Connectors
(Operations to be carried out with the power supply and BBU disconnected)
•
Check that the wire connectors are firmly attached.
•
Check that the terminals are fully tightened.
•
Check that the insulation of the wires is in good condition and that no conductors
are exposed.
•
Check that mechanism fixings, screws and encoder grub screws are tight.
•
Carry out general testing as described previously.
Содержание SpeedStile BP DS Standard Lane
Страница 1: ...S P E E D S T I L E BP DS series Operation Maintenance Manual...
Страница 2: ......