Official GSK Agents in South Africa
Tel: +27 11 626 2720, [email protected]
Chapter 7 Tool Offset & Setting
299
Ⅱ
Operation
window of the “Integral information”
The high-efficiency tool-change function can be enabled after the X and Z are set; the setting
value at the tool-change safety area is memorized after the power is turned off. After the high
efficiency tool-change is enabled, the tool mark is then shown at the right corner of the page “
”.
Note: The record in the setting of the tool-change safety point is the machine coordinate.
7.6.3 Setting Clear in Tool-Change Safety Area
The setting value of the set tool-change safety area can be eliminated by the following methods:
1) The set data along with the X or Z can be eliminated by soft button
or
after the
tool-change safety point setting window is shown;
2) The setting data set by X or Z axis on the tool-change safety area will be automatically eliminated
after the G50 command sets the coordinate system;
3) The setting data set by X or Z axis on the tool-change safety area will be automatically eliminated
after the machine zero return is operated;
4) On the tool offset page, if the tool-setting operation is performed by the measure input method or
trial cutting tool-setting method; the current tool is regarded as to be changed; the setting data set by
its corresponding data on the tool-change safety area will be automatically eliminated.
7.6.4 High-Efficiency Too-Change Programming Format
In order to realize the high-efficiency tool-change, user should use the shared programming
format both the positioning G code and Tool-change T code when the machining procedure is
programmed.
G00 X_ Z_ T_ or
G01 X_ Z_ T_
T code is performed sharing a same block with G00 or G01 code, simultaneously, the T code is
performed while the positioning code executes; and then deliver the tool-change strobe signal TF to
PLC. When the plate moves to the tool-change safety area, CNC delivers the tool-change allowable
signal TCEN. PLC program triggers the tool-change operation by identifying the tool strobe signal TF
and tool-change allowable signal TCEN. Refer to the following signal output time of high-efficiency
tool-change:
Содержание 980TDi
Страница 17: ...Official GSK Agents in South Africa Tel 27 11 626 2720 design efamatic com 1 Programming I Programming...
Страница 225: ...Official GSK Agents in South Africa Tel 27 11 626 2720 design efamatic com 209 Operation II Operation...
Страница 379: ...Official GSK Agents in South Africa Tel 27 11 626 2720 design efamatic com 363 Connection III Connection...
Страница 539: ...Official GSK Agents in South Africa Tel 27 11 626 2720 design efamatic com 523 IV Appendix IV Appendix...