Official GSK Agents in South Africa
Tel: +27 11 626 2720, [email protected]
Chapter 2 Power ON/OFF And Protection
235
Ⅱ
Operation
CHAPTER 2 POWER ON/OFF AND PROTECTION
2.1 System Power-on
Before GSK980TDi power on, the following items should be confirmed:
1. The machine is in a normal state.
2. The power voltage conforms to the requirement of the machine.
3. The connection is correct and secure.
The following window is displayed after GSK980TDi is turned on:
The current position (ABSOLUTE POS) page is displayed after GSK980TDi automatic detection and
initiation are finished.
2.2 System Power-off
Before power is off, ensure that:
1. The feed axes of the CNC is at stop;
2. Miscellaneous functions (spindle, cooling etc.) are OFF;
3. Cut off CNC power prior to machine power cutting off.
Note: Please refer to the machine manufacturer’s manual about turn-off the machine’s power supply.
Содержание 980TDi
Страница 17: ...Official GSK Agents in South Africa Tel 27 11 626 2720 design efamatic com 1 Programming I Programming...
Страница 225: ...Official GSK Agents in South Africa Tel 27 11 626 2720 design efamatic com 209 Operation II Operation...
Страница 379: ...Official GSK Agents in South Africa Tel 27 11 626 2720 design efamatic com 363 Connection III Connection...
Страница 539: ...Official GSK Agents in South Africa Tel 27 11 626 2720 design efamatic com 523 IV Appendix IV Appendix...