
4. Position the door stiffeners (61) under the base stiffener (60) on top of the outer door frame
weldment (31) and install using 3/4" x 5" HHTB bolts (4), 3/4" flat washers (16), 3/4" square washers
(17) and 3/4" hex nuts (25).
NOTE:
Make sure to place the upper cover (37) between the base stiffener (60) and the outer door
frame weldment (31) before installing the HHTB bolts (4).
5. Repeat steps 2 and 3 to attach the door stiffeners (61) to the stiffener support weldment (62).
Figure 7-12
Installing the door stiffeners - 3 post
4
3/4" x 5" HHTB bolt (S-7324)
37
Upper cover (NCWT0761)
16
3/4" flat washer (S-866)
60
Base stiffener
17
3/4" square washer (HT-635-BS)
61
Door stiffener (NCWT0482-BS)
25
3/4" hex nut (S-240)
62
Stiffener support weldment (NCWT0481-BS)
31
Outer door frame weldment (NCWT0756)
86
PNEG-5490D-2X
90' Diameter EVO-50 Beam 2X Bin
Содержание EVO-50
Страница 6: ...NOTES 6 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 34: ...NOTES 34 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 130: ...NOTES 130 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 188: ...NOTES 188 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 220: ...NOTES 220 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...