
Base Stiffener (10-16 Ga.) to a Base Boot
Refer to the below information when connecting a base stiffener (CTS-4038XX) to a base boot
(CTS-4046XX).
2
M10 x 25 flange bolt (S-10782)
3
M10 flange nut (S-10784)
19
Base stiffener (CTS-4038XX)
26
Base boot (CTS-4046XX)
35
Completed assembly
NOTE:
Two-post stiffeners shown. The bolt pattern will
vary for 3-post. Only place bolts where holes
in the stiffeners align with holes in the sidewall
sheet.
Base Stiffener (2+12 Ga. - 6 Ga.) to a Base Boot
Refer to the below information when connecting a base stiffener (CTS-4033XX) to a base boot
(CTS-4045XX).
2
M10 x 25 flange bolt (S-10782)
3
M10 flange nut (S-10784)
16
Base stiffener (CTS-4033XX)
25
Base Boot (CTS-4045XX)
35
Completed assembly
NOTE:
Two-post stiffeners shown. The bolt pattern will
vary for 3-post. Only place bolts where holes
in the stiffeners align with holes in the sidewall
sheet.
70
PNEG-5490D-2X
90' Diameter EVO-50 Beam 2X Bin
Содержание EVO-50
Страница 6: ...NOTES 6 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 34: ...NOTES 34 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 130: ...NOTES 130 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 188: ...NOTES 188 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 220: ...NOTES 220 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...