
12.Working in a
counter-clockwise
direction, repeat the procedure to continue to fill in all the exposed
gaps (134) using the lower roof panels (114) and the upper roof panels (116) on the roof.
13.Secure the upper roof panels (116) to the roof panel holes (154) in the purlins 6, 7 and 8 using
5/16" x 1" flange bolts (2) and 5/16" flange nuts (19).
14.Install the lower roof panels (114) to the roof panel support clips (155) using 5/16" x 1" flange bolts
(2) and 5/16" flange nuts (19).
NOTE:
The roof panels (114 and 116) may not have the holes to align with the roof panel support
clips (155). You need to field drill the roof panels from inside using the holes of the roof panel
support clips (155) as a template.
IMPORTANT:
Failure to properly secure the roof panel (114 and 116) to the purlins (132) will
constitute a modification to the product not specifically delineated in this manual and
will void the limited warranty.
PNEG-5490D-2X
90' Diameter EVO-50 Beam 2X Bin
173
Содержание EVO-50
Страница 6: ...NOTES 6 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 34: ...NOTES 34 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 130: ...NOTES 130 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 188: ...NOTES 188 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 220: ...NOTES 220 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...