
5. Repeat the procedure to continue installing the lower roof panels (114) with the upper roof panels
(116) to each roof rafter, leaving an exposed gap (134) between each set (lower and upper) of
installed panels.
Figure 8-30
Installing the lower and upper roof panels
2
5/16" x 1" flange bolt with sealing washer (S-10260)
114
Lower roof panel (CTR-2036)
19
5/16" flange nut (S-3611)
116
Upper roof panel (CTR-1872)
27
Eave angle (CTR-0721)
128
Rafter
113
Roof panel clip (CTR-2191)
134
Exposed gap
170
PNEG-5490D-2X
90' Diameter EVO-50 Beam 2X Bin
Содержание EVO-50
Страница 6: ...NOTES 6 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 34: ...NOTES 34 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 130: ...NOTES 130 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 188: ...NOTES 188 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 220: ...NOTES 220 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...