
Figure 8-18
Assembling the purlin 2 and diagonal bracing to the A-frame assembly
5
1/2" x 1-3/4" flange bolt (S-10252)
60
Left purlin clip (CTR-0876)
17
1/2" flange nut (S-10253)
62
Right purlin clip (CTR-0950)
32
Lower roof rafter (CTR-2180)
77
Diagonal bracing (CTR-2199)
47
Purlin (CTR-2182)
After You Finish
Repeat this process to install the purlin 2 and diagonal bracing between the remaining A-frame
assemblies.
156
PNEG-5490D-2X
90' Diameter EVO-50 Beam 2X Bin
Содержание EVO-50
Страница 6: ...NOTES 6 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 34: ...NOTES 34 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 130: ...NOTES 130 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 188: ...NOTES 188 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 220: ...NOTES 220 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...