
Installing the Door Frames to the Sidewall
1. Position the jamb plate weldments (32) to the inside of the sidewall with outer door frame weldment
(31) to the outside of the bin.
2. Place the corrugated sealing strip (69) between the outer and inner edges of the sidewall to jamb
plate weldment (32) connection. Apply rope caulk (68) around the corrugated sealing strip (69).
3. Also, apply rope caulk (68) between the sidewall to seal weldment (36) at the top and bottom of the
door frame weldments.
NOTE:
Refer to note in
Installing the Door Weldment, page 77
for details on the specific order in
which these parts must be assembled. (The seal weldments must be installed into the
sidewall before the frames and jamb plate weldments.)
Figure 7-9
Caulking the door frame
31
Outer door frame weldment (NCWT0738) (2-post)
36
Seal weldment (NCTW0745) (2-post)
Outer door frame weldment (NCWT0756) (3-post)
Seal weldment (NCTW0759) (3-post)
32
Jamb plate weldment (NCWT0736-BS) (2-post)
68
Rope caulk
Jamb plate weldment (NCWT0754-BS) (3-post)
33
Inner door frame weldment (NCWT0732-BS) (2-post)
69
Corrugated sealing strip
Inner door frame weldment (NCWT0751-BS) (3-post)
PNEG-5490D-2X
90' Diameter EVO-50 Beam 2X Bin
83
Содержание EVO-50
Страница 6: ...NOTES 6 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 34: ...NOTES 34 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 130: ...NOTES 130 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 188: ...NOTES 188 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 220: ...NOTES 220 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...