
Chapter 4: Assembling the Sidewall Sheets
3. Before bolting the next ring into place, apply one 13" (33 cm) long strip of caulk (3) along the lower
horizontal edge of the lapping sheet (1) at every vertical seam. This will fill the space that occurs
between the holes caused by the overlapping sheets.
4. Start assembling the sidewall sheets end to end (overlapping the same way throughout), until the
ring is completed.
Figure 4-4
Caulking and assembling the non-laminated sidewall sheets
1
Sidewall sheet
3
13" (33 cm) Horizontal strip of caulk
2
Vertical strip of caulk
5. Use the supplied tube caulk to fill the larger gaps that occur with heavier gauges.
40
PNEG-5490D-2X
90' Diameter EVO-50 Beam 2X Bin
Содержание EVO-50
Страница 6: ...NOTES 6 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 34: ...NOTES 34 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 130: ...NOTES 130 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 188: ...NOTES 188 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 220: ...NOTES 220 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...