
Caulking for the Sidedraw Weldment
1. To seal the sidedraw weldment (60) to the sidewall sheets (49), use one strip of caulking (65) on
each side of the outer row of bolts.
2. Use the discharge tube weldment as a template to field drill the bolt holes (67) in the sidewall
sheet (49).
3. Use 3/8" bolts and nuts provided to assemble the sidedraw weldment (60) with the sidewall
sheet (49).
Figure 9-20
Caulking for the sidedraw weldment
49
Sidewall sheet
66
Field cut hole
60
Sidedraw weldment
67
Use as template to field drill holes
65
Caulking
PNEG-5490D-2X
90' Diameter EVO-50 Beam 2X Bin
215
Содержание EVO-50
Страница 6: ...NOTES 6 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 34: ...NOTES 34 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 130: ...NOTES 130 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 188: ...NOTES 188 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 220: ...NOTES 220 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...