DANGER
All lifting should be performed by a certified crane operator with prior bin
construction experience. Never lift during windy conditions.
General Guidelines:
• Construct the A-frame sections on flat ground or blocking.
• Install the temperature cable brackets at the same time you assemble the A-frame sections.
• Always be aware of the orientation of each part prior to assembling.
• Use the correct hardware for the part being assembled. Never substitute hardware.
• Always ensure the hardware is tightened prior to lifting.
• Always practice safety when assembling the rafter sections. Be aware of others around you when
moving long A-frame sections.
• Use evenly distributed connection points of support when lifting.
• Before attempting a lift, adjust each lifting cable to achieve the appropriate angle needed
(approximately 30 degrees).
• Assemble the A-frames with diagonal bracing last, so that they can be easily accessed for lifting into
place first.
Table 8-3
For delta roof
Bin Diameter
Peak Capacity
Roof Snow Load
Approximate A-Frame Weight
With Diagonal
Bracing
Without Diagonal
Bracing
90' (27.43 m)
150K
50 PSF
2460 lbs. (1116 kg)
2109 lbs. (957 kg)
The part variance multiplier is 4%.
164
PNEG-5490D-2X
90' Diameter EVO-50 Beam 2X Bin
Содержание EVO-50
Страница 6: ...NOTES 6 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 34: ...NOTES 34 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 130: ...NOTES 130 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 188: ...NOTES 188 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 220: ...NOTES 220 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...