
Installing the Top Panels
The top panels seal the area between the inner center collar and outer center collar.
1. Place a continuous strip of caulk (21) on the mating surfaces of the top panel with the roof
flashing (118).
Figure 8-38
Placing tube of caulk on the roof flashing
21
3/8" x 1" caulk (S-10319)
118
Roof flashing (CTR-2120)
180
PNEG-5490D-2X
90' Diameter EVO-50 Beam 2X Bin
Содержание EVO-50
Страница 6: ...NOTES 6 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 34: ...NOTES 34 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 130: ...NOTES 130 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 188: ...NOTES 188 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Страница 220: ...NOTES 220 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...