
Installation and operating manual
EN-16
G932.1 - 06/2010
EN
EN
sonnel' on page 15. Depending on the usage conditions (e.g.
operation in an extremely dirty environment), an intermediate
inspection may be necessary.
The general overhaul periods are, at the latest:
250 running hours for devices with 12 or 18 m/min rope
speeds,
500 running hours for devices with 6 or 9 m/min rope
speeds.
A general overhaul of the hoist must only to be undertaken by
Greifzug Hebezeugbau GmbH or a hoisting gear workshop that
has been approved by Greifzug Hebezeugbau GmbH.
We recommend that the system is tested in our factory by
Greifzug Hebezeugbau GmbH.
Contact Greifzug Hebezeugbau GmbH or your supplier with
regards to this test.
15.3
Reading the running hours counter
The running hours counter is located in the hoist's terminal box.
The running hours counter counts the time in which the hoist is in
operation as running hours (UPWARD or DOWNWARD move-
ments).
DANGER!
Danger of death due to electric shock!
–
Disconnect the hoist from the power supply by pulling out
the plug.
–
Pull out the power plug.
–
Open the terminal box.
–
Read the running hours counter:
–
Note the running hours in the logbook.
–
Close the terminal box.
15.4
Care and maintenance
Interval
Work
Implementation
Daily
–
Check the anchorage of the
hoist
–
Inspect the rope for clinging
dirt
Operating person-
nel
–
Check the rope, see page 16 Operating person-
nel
Weekly
–
Check the connecting cable
and control cable
Operator
Interval
Work
Implementation
Every 50
running
hours
–
Traction sheave external
teeth (only model series
X 3050), see page 17
Operating person-
nel
1 x annually –
Safety inspection for the
hoist
Authorized mainte-
nance personnel
250
1)
/ 500
2)
Running
hours
–
General overhaul of the hoist Greifzug He-
bezeugbau GmbH
or a hoisting gear
workshop that has
been approved by
Greifzug He-
bezeugbau GmbH
Whenever
necessary
See page 16:
–
Clean the rope
–
Lubricate the rope
–
Replace the rope
Trained person
nominated by the
operator
Whenever
necessary
–
Replace the cable
Electrician
1)
Devices with 12 or 18 m/min rope speed
2)
Devices with 6 or 9 m/min rope speed
Rope
DANGER!
Risk of injury through stabs and cuts!
Broken wires in the wire rope can result in protruding wires!
Protruding wires can cut or stab through safety gloves!
–
Wear suitable leather protective gloves when working
with wire ropes.
–
Never let the wire rope run through your hands!
Cleaning
Brush the dirt off soiled ropes when dry if necessary. Re-lubricate
as necessary.
Use the brush attachments to clean the rope at the hoist in an
extremely dirty environment.
Lubrication
DANGER!
Danger due to falling objects due to slippery or damaged
ropes or brake failure and malfunction!
Might result in severe injuries or even death!
–
Do not lubricate the rope using a lubricant that contains
disulfide (e.g. Molycote
®
).