![GE Vivid E9 Скачать руководство пользователя страница 565](http://html1.mh-extra.com/html/ge/vivid-e9/vivid-e9_service-manual_4205051565.webp)
GE H
EALTHCARE
D
IRECTION
GA091568, R
EVISION
5
VIVID E9 S
ERVICE
M
ANUAL
Chapter 8 - Replacement procedures
8 - 231
8-10-4-2
Relay Board removal procedure
Follow these steps to remove the Relay Board:
1.) Pull out the Relay Board.
2.) Place it on an ESD safe place.
8-10-4-3
Relay Board installation procedure
Follow these steps to install the Relay Board:
1.) Carefully align the Relay Board with the rails and push it. Push the card to the left, so it enters
correct in the mechanical slide, before you push it in position so it is seated in the Back Plane
connectors.
2.) Carefully install the two Front Plane Boards.
3.) Install the FEP Cover and fasten it with its fixing screws.
4.) Plug in the PCIe (GFI) Cable.
5.) Install the cover for the PCIe cable.
6.) Install the Right Side Cover.
8-10-4-4
Calibration and adjustments
Calibrate the Front End A/D converters as described in:
•
Section 6-6 "DC Offset Calibration (Front End Alignment)" on page 6-11
.
Содержание Vivid E9
Страница 1: ...GE Healthcare OPERATING DOCUMENTATION VIVID E9 Service Manual Part Number GA091568 Revision 5...
Страница 2: ......
Страница 11: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL ix ZH CN KO...
Страница 34: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL xxxii...
Страница 800: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL Index 12...
Страница 801: ......