Description and operation
SF
6
gas monitoring
GE Information
07- 2016
L20- 001EN/08
5/6
Densimeter
Function
D
Permanent SF
6
gas density monitoring.
D
Visual SF
6
gas real pressure information (MPa - psi).
Localization
The densimeter is situated onto the bottom of the pole of the circuit- breaker,
and joined to the gas volume of the circuit- breaker.
Working
The densimeter is fitted with internal contacts. These contacts close success-
ively if the gas’s density diminishes and determine 2 distinct thresholds.
These contacts are wired to the terminal block inside the cubicle and are usu-
ally left at the user’s disposal for the following use :
D
Alarm pressure ”
p
ae
” acts as a warning (topping up necessary).
D
Minimum functional pressure for insulation ”
p
me
” must be used either to
lock the circuit- breaker in position or to cause automatic opening. The option
is chosen by the client in keeping with operating requirements.
All the circuit- breaker’s rated performances are guaranteed up to the min-
imum specified ambient temperature and the minimum functional pressure
for insulation ”
p
me
”.
Continued on next page.
Содержание SF6
Страница 2: ...Content Instruction Manual GE Information 04 2017 D1736EN 03 2 10 This page is intentionally blank...
Страница 50: ...Installation Tightening torques GE Information 07 2016 L31 001EN 03 4 4 This page is intentionally blank...
Страница 128: ...Installation Vacuum operation GE Information 08 2016 L31 881EN04 6 6 This page is intentionally blank...
Страница 176: ...Maintenance Maintenance plan GE Information 08 2016 L51 004EN 07 8 8 This page is intentionally blank...
Страница 178: ...Maintenance Electrical wear limits GE Information 08 2016 L51 052EN 05 2 2 This page is intentionally blank...
Страница 204: ...Annexes Tooling and accessories GE Information 08 2016 L60 028EN 04 8 8 This page is intentionally blank...
Страница 206: ...Grid Solutions This page is intentionally blank...
Страница 212: ...Grid Solutions This page is intentionally blank...
Страница 216: ...Grid Solutions This page is intentionally blank...
Страница 220: ...Grid Solutions This page is intentionally blank...
Страница 258: ...Installation Lifting and positioning the pole GE Information 08 2016 L31 200EN 07 4 4 This page is intentionally blank...
Страница 286: ...Installation Coupling of column and chambers GE Information L31 7138EN 02 16 16 11 2016 This page is intentionally blank...
Страница 299: ...GE Information This page is intentionally blank...
Страница 300: ......