Installation
Coupling of column and chambers
GE Information
L31- 7137EN/02
15/18
11- 2016
Final coupling,
continued
Connection
chambers/column
The table below shows the steps for fitting the chamber- column coupling pin:
Step
Action
Illustration
1
Clean the contact surfaces
”
A
” and ”
B
” with ISOPRO-
PANOL.
Only coat surface
”B”
with
MOLYKOTE M111 lubricant.
Remove the rigid cable (36).
Remove the trolley stop fix-
ing screws (40).
B
A
36
40
2
Lower the seal (20) onto the
chamber casing.
Lower the screws (42) on
the centring pins.
42
42
20
3
Continue to slowly lower the
column, removing the first
two sections of centring pin
(30 & 31) when they are no
longer of any use as a guide,
in the following order:
- First section
(C)
- Screw (42)
- Second section
(B)
NOTE: The aim of this
operation is to prevent
the centring pins com-
ing into contact with the
porcelain fins on the
column.
30
31
(C)
(42)
(B)
Continued on next page.
Содержание SF6
Страница 2: ...Content Instruction Manual GE Information 04 2017 D1736EN 03 2 10 This page is intentionally blank...
Страница 50: ...Installation Tightening torques GE Information 07 2016 L31 001EN 03 4 4 This page is intentionally blank...
Страница 128: ...Installation Vacuum operation GE Information 08 2016 L31 881EN04 6 6 This page is intentionally blank...
Страница 176: ...Maintenance Maintenance plan GE Information 08 2016 L51 004EN 07 8 8 This page is intentionally blank...
Страница 178: ...Maintenance Electrical wear limits GE Information 08 2016 L51 052EN 05 2 2 This page is intentionally blank...
Страница 204: ...Annexes Tooling and accessories GE Information 08 2016 L60 028EN 04 8 8 This page is intentionally blank...
Страница 206: ...Grid Solutions This page is intentionally blank...
Страница 212: ...Grid Solutions This page is intentionally blank...
Страница 216: ...Grid Solutions This page is intentionally blank...
Страница 220: ...Grid Solutions This page is intentionally blank...
Страница 258: ...Installation Lifting and positioning the pole GE Information 08 2016 L31 200EN 07 4 4 This page is intentionally blank...
Страница 286: ...Installation Coupling of column and chambers GE Information L31 7138EN 02 16 16 11 2016 This page is intentionally blank...
Страница 299: ...GE Information This page is intentionally blank...
Страница 300: ......