End of equipment service life
Dismantling and recovery of
components of circuit breaker
GE Information
07- 2016
L80- 000EN/03
4/6
III - Categories and treatment of the materials
1 - Treatment of
SF6 gas
The SF6 gas will be recycled in accordance with the recommendations of
the IEC 60480 Standard.
However, when recovering the SF6 gas, it is important to respect the fol-
lowing precautions:
- Weigh the recipients used before and after filling, so as to ensure trace-
ability of the weights recovered
- For each recipient, carry out a measurement of the purity of the SF6
gas and a search for the decomposition products (SO2, HF)
In case of absence of a local waste processing channel for the recycling of
SF6, we recommend a return to our site in Villeurbanne, where we pro-
pose reprocessing via our European service providers.
2 - Materials to be
recycled
Metals form the main constituent of a gas insulated substation.
The main types of metal making up a substation are:
- Steel: steelwork structure, fasteners, electrical cubicle frames, etc.
- Aluminium: moulded or mechanical welded enclosures, conductor bars,
electrodes, etc.
- Bolted fasteners, threaded rods, rating and name plates
- Bare copper: electrical contacts, etc.
- Insulated copper: electrical cable
It is important to separate these different metals when dismantling the sub-
station at the end of its service life. In particular for small sub- assemblies
made up of various materials.
In certain simple cases, it is sufficient to remove the fasteners ensuring the
assembly and, in other cases, specific instructions shall be given.
The aluminium and copper elements must, under no circumstances,
be mixed. Specific waste processing channels associated with these
materials do not allow for perfect separation during their processing.
In cases where it is impossible to separate them, the component
must be sent for incineration.
Содержание SF6
Страница 2: ...Content Instruction Manual GE Information 04 2017 D1736EN 03 2 10 This page is intentionally blank...
Страница 50: ...Installation Tightening torques GE Information 07 2016 L31 001EN 03 4 4 This page is intentionally blank...
Страница 128: ...Installation Vacuum operation GE Information 08 2016 L31 881EN04 6 6 This page is intentionally blank...
Страница 176: ...Maintenance Maintenance plan GE Information 08 2016 L51 004EN 07 8 8 This page is intentionally blank...
Страница 178: ...Maintenance Electrical wear limits GE Information 08 2016 L51 052EN 05 2 2 This page is intentionally blank...
Страница 204: ...Annexes Tooling and accessories GE Information 08 2016 L60 028EN 04 8 8 This page is intentionally blank...
Страница 206: ...Grid Solutions This page is intentionally blank...
Страница 212: ...Grid Solutions This page is intentionally blank...
Страница 216: ...Grid Solutions This page is intentionally blank...
Страница 220: ...Grid Solutions This page is intentionally blank...
Страница 258: ...Installation Lifting and positioning the pole GE Information 08 2016 L31 200EN 07 4 4 This page is intentionally blank...
Страница 286: ...Installation Coupling of column and chambers GE Information L31 7138EN 02 16 16 11 2016 This page is intentionally blank...
Страница 299: ...GE Information This page is intentionally blank...
Страница 300: ......