DURÉES DE FONCTIONNEMENT
(en ms à tension assignée)
MECHANICAL OPERATING TIMES
( in ms at rated voltage)
DURÉES DES CHAMBRES
TIMINGS OF CHAMBERS
MANOEUVRE
OPERATION
Minimum Maximum
Fermeture -
Closing
92
112
Ouverture O1/O2 -
Opening O1/O2
18
26
Fermeture de CO -
Closing of CO
92
112
Ouverture de CO -
Opening of CO
40
56
CO
45
70
1ère Ouverture de O-CO -
1st Opening of O-CO
18
26
Fermeture de O-CO -
Closing of O-CO
92
112
2ème Ouverture de O-CO -
2nd Opening of O-CO
40
56
Insertion de la résistance à la fermeture –
Resistor insertion on closing
5.5
9,0
DURÉES DES RELAIS
TIMINGS OF RELAY
Pour relais Allen Bradley
For Allen Bradley relay
Enclenchement
Closing
Déclenchement
Opening
Mini
Maxi
Mini
Maxi
Durée en ms à U assignée
Time relais at nominal voltage
16
28
16
28
CA 103 171-3
12/02/2002
009
20/01/2017
4/6
N° d’Instruction
Date d’émission
Indice
Date de révision
Page
Ce document est propriété exclusive de GE et ne doit pas être utilisé, copié ou communiqué à des tiers sans son autorisation
Содержание SF6
Страница 2: ...Content Instruction Manual GE Information 04 2017 D1736EN 03 2 10 This page is intentionally blank...
Страница 50: ...Installation Tightening torques GE Information 07 2016 L31 001EN 03 4 4 This page is intentionally blank...
Страница 128: ...Installation Vacuum operation GE Information 08 2016 L31 881EN04 6 6 This page is intentionally blank...
Страница 176: ...Maintenance Maintenance plan GE Information 08 2016 L51 004EN 07 8 8 This page is intentionally blank...
Страница 178: ...Maintenance Electrical wear limits GE Information 08 2016 L51 052EN 05 2 2 This page is intentionally blank...
Страница 204: ...Annexes Tooling and accessories GE Information 08 2016 L60 028EN 04 8 8 This page is intentionally blank...
Страница 206: ...Grid Solutions This page is intentionally blank...
Страница 212: ...Grid Solutions This page is intentionally blank...
Страница 216: ...Grid Solutions This page is intentionally blank...
Страница 220: ...Grid Solutions This page is intentionally blank...
Страница 258: ...Installation Lifting and positioning the pole GE Information 08 2016 L31 200EN 07 4 4 This page is intentionally blank...
Страница 286: ...Installation Coupling of column and chambers GE Information L31 7138EN 02 16 16 11 2016 This page is intentionally blank...
Страница 299: ...GE Information This page is intentionally blank...
Страница 300: ......