Installation
Calculation of the SF
6
gas filling pressure
for using the pressure gauge (tool)
GE Information
08- 2016
L31- 922EN/04
1/4
Presentation
Introduction
SF
6
pressure values, for the filling, must obligatorily be read on the pressure
gauge 0- 1 MPa (tooling). Pay no attention to indications given by the dial den-
simeter (MPa - psi), it is not accurate enough for the filling.
Pressure gauge 0...1 MPa
Pressure units
(reminder)
D
The international unit pressure is the Pascal (Pa).
1 bar (14.503 psi) = 1,000 hPa
1 bar = 100 kPa
10 bar = 1 MPa
Symbols
IEC symbols for the apparatus technical characteristics.
Symbol
Designation
p
re
Filling rated pressure for the insulation
p
ae
Alarm pressure for the insulation
p
me
Minimal pressure for the insulation
In this module
This module contains the following topics :
Topic
Page
Example of the filling pressure calculation
2
Calculation of the filling pressure at site
3
Values of the SF
6
gas pressures in accordance
with the temperature
4
Important
The filling pressure may be incorrectly shown at low temperatures due to the
risk of partial liquefaction of the SF
6
gas. It is therefore not recommended that
filling or top- up operations be carried out at low temperatures (
L
) from the
tables entitled ”Effective, temperature- corrected SF
6
gas pressure values”.
Содержание SF6
Страница 2: ...Content Instruction Manual GE Information 04 2017 D1736EN 03 2 10 This page is intentionally blank...
Страница 50: ...Installation Tightening torques GE Information 07 2016 L31 001EN 03 4 4 This page is intentionally blank...
Страница 128: ...Installation Vacuum operation GE Information 08 2016 L31 881EN04 6 6 This page is intentionally blank...
Страница 176: ...Maintenance Maintenance plan GE Information 08 2016 L51 004EN 07 8 8 This page is intentionally blank...
Страница 178: ...Maintenance Electrical wear limits GE Information 08 2016 L51 052EN 05 2 2 This page is intentionally blank...
Страница 204: ...Annexes Tooling and accessories GE Information 08 2016 L60 028EN 04 8 8 This page is intentionally blank...
Страница 206: ...Grid Solutions This page is intentionally blank...
Страница 212: ...Grid Solutions This page is intentionally blank...
Страница 216: ...Grid Solutions This page is intentionally blank...
Страница 220: ...Grid Solutions This page is intentionally blank...
Страница 258: ...Installation Lifting and positioning the pole GE Information 08 2016 L31 200EN 07 4 4 This page is intentionally blank...
Страница 286: ...Installation Coupling of column and chambers GE Information L31 7138EN 02 16 16 11 2016 This page is intentionally blank...
Страница 299: ...GE Information This page is intentionally blank...
Страница 300: ......