Installation
Coupling of column and chambers
GE Information
L31- 7137EN/02
1/18
11- 2016
Presentation
Markings
Before coupling the chambers and column, check that the markings on the
breaking chambers correspond with those on the column
Time taken for
coupling operation
The final chamber/column coupling operations should be completed in a
time of
40 min.
NOTE: The coupling operations must be carried out by a mini-
mum of two people.
T(max)
40 min
Lifting means
Provide an adequate means of hoisting:
3,000 daN
(minimum)
H + 2 m
H
H +1 m
Stages of the
coupling operation
The chamber- column coupling operation can be broken down into a num-
ber of stages:
Step
Subject
Page
A
Positioning the chamber casing
2
B
Preparing the breaking chambers
3
C
Preparing the column’s corona shield
4
D
Preparing the elements required for the coupling opera-
tion
5
E
Hoisting and preparing the column
7
F
Final coupling
8
Содержание SF6
Страница 2: ...Content Instruction Manual GE Information 04 2017 D1736EN 03 2 10 This page is intentionally blank...
Страница 50: ...Installation Tightening torques GE Information 07 2016 L31 001EN 03 4 4 This page is intentionally blank...
Страница 128: ...Installation Vacuum operation GE Information 08 2016 L31 881EN04 6 6 This page is intentionally blank...
Страница 176: ...Maintenance Maintenance plan GE Information 08 2016 L51 004EN 07 8 8 This page is intentionally blank...
Страница 178: ...Maintenance Electrical wear limits GE Information 08 2016 L51 052EN 05 2 2 This page is intentionally blank...
Страница 204: ...Annexes Tooling and accessories GE Information 08 2016 L60 028EN 04 8 8 This page is intentionally blank...
Страница 206: ...Grid Solutions This page is intentionally blank...
Страница 212: ...Grid Solutions This page is intentionally blank...
Страница 216: ...Grid Solutions This page is intentionally blank...
Страница 220: ...Grid Solutions This page is intentionally blank...
Страница 258: ...Installation Lifting and positioning the pole GE Information 08 2016 L31 200EN 07 4 4 This page is intentionally blank...
Страница 286: ...Installation Coupling of column and chambers GE Information L31 7138EN 02 16 16 11 2016 This page is intentionally blank...
Страница 299: ...GE Information This page is intentionally blank...
Страница 300: ......