Installation
Installation of operating device
GE Information
L31- 7902EN/02
5/12
11- 2016
Preparing the pole operating shaft
, continued
“Manual opening”
operation,
continued
The table below gives the steps of “manual opening” operation :
Step
Action
Diagram
3
Put back the blocking tool
(4) on the flange of the
sleeve (12).
NOTE
: This tool ensure
the angular positioning of
pole operating shaft dur-
ing the coupling with the
operating mechanism.
6
4
12
4
M10
4
Remove the lever (6).
5
Remove the safety plate (5)
and the screws from the
flange on the front of the
handle sleeve (12).
12
5
8
Содержание SF6
Страница 2: ...Content Instruction Manual GE Information 04 2017 D1736EN 03 2 10 This page is intentionally blank...
Страница 50: ...Installation Tightening torques GE Information 07 2016 L31 001EN 03 4 4 This page is intentionally blank...
Страница 128: ...Installation Vacuum operation GE Information 08 2016 L31 881EN04 6 6 This page is intentionally blank...
Страница 176: ...Maintenance Maintenance plan GE Information 08 2016 L51 004EN 07 8 8 This page is intentionally blank...
Страница 178: ...Maintenance Electrical wear limits GE Information 08 2016 L51 052EN 05 2 2 This page is intentionally blank...
Страница 204: ...Annexes Tooling and accessories GE Information 08 2016 L60 028EN 04 8 8 This page is intentionally blank...
Страница 206: ...Grid Solutions This page is intentionally blank...
Страница 212: ...Grid Solutions This page is intentionally blank...
Страница 216: ...Grid Solutions This page is intentionally blank...
Страница 220: ...Grid Solutions This page is intentionally blank...
Страница 258: ...Installation Lifting and positioning the pole GE Information 08 2016 L31 200EN 07 4 4 This page is intentionally blank...
Страница 286: ...Installation Coupling of column and chambers GE Information L31 7138EN 02 16 16 11 2016 This page is intentionally blank...
Страница 299: ...GE Information This page is intentionally blank...
Страница 300: ......