Grid Solutions
PS 0007EN
05
G. BERNARD
1998-08-12
J. VIAT
2011-03-21
1 / 2
Sheet N°
Revision Written by
Date
Signature Approved by
Date
Signature Page
SAFETY SHEET
M A C H I N E R Y
CAUSE OR ORIGIN OF HAZARD
.
Our equipment contains moving parts (linkage, levers, etc.), reserve power (springs, accumulators, etc.)
and pressurized sheathing ; the associated hazards are dealt with in safety sheet "Pressurized Equipment"
PS 0003/A.
WORK REQUIREMENTS.
Follow the relevant Grid Solutions operating and maintenance instructions.
Prior to any work on the control equipment and the motion transfer mechanism, disable the springs on
mechanically operated units and bring pressure back to zero for hydraulically operated units.
SAFETY INSTRUCTIONS
.
OBSERVE ALL GENERAL INSTRUCTIONS GOVERNING INSTALLATION, COMMISSIONING AND
OPERATION IN ACCORDANCE WITH CURRENTLY ACCEPTED PRACTICES AS WELL AS THOSE LAID
DOWN IN THE DOCUMENTATION SUPPLIED WITH THE EQUIPMENT.
As a general rule, work on the control equipment and transmissions must be performed by qualified operators
wearing personal protective clothing and using the appropriate tools and equipment.
Содержание SF6
Страница 2: ...Content Instruction Manual GE Information 04 2017 D1736EN 03 2 10 This page is intentionally blank...
Страница 50: ...Installation Tightening torques GE Information 07 2016 L31 001EN 03 4 4 This page is intentionally blank...
Страница 128: ...Installation Vacuum operation GE Information 08 2016 L31 881EN04 6 6 This page is intentionally blank...
Страница 176: ...Maintenance Maintenance plan GE Information 08 2016 L51 004EN 07 8 8 This page is intentionally blank...
Страница 178: ...Maintenance Electrical wear limits GE Information 08 2016 L51 052EN 05 2 2 This page is intentionally blank...
Страница 204: ...Annexes Tooling and accessories GE Information 08 2016 L60 028EN 04 8 8 This page is intentionally blank...
Страница 206: ...Grid Solutions This page is intentionally blank...
Страница 212: ...Grid Solutions This page is intentionally blank...
Страница 216: ...Grid Solutions This page is intentionally blank...
Страница 220: ...Grid Solutions This page is intentionally blank...
Страница 258: ...Installation Lifting and positioning the pole GE Information 08 2016 L31 200EN 07 4 4 This page is intentionally blank...
Страница 286: ...Installation Coupling of column and chambers GE Information L31 7138EN 02 16 16 11 2016 This page is intentionally blank...
Страница 299: ...GE Information This page is intentionally blank...
Страница 300: ......