Installation
Installation of operating device
GE Information
L31- 7902EN/02
12/12
11- 2016
Permanent heating system
Process
Switch on the permanent heating system of the operating device (in both sum-
mer and winter) to avoid condensation, and the corrosion which might result
from this.
DO NOT SUPPLY THE OPERATING MECHANISM MOTOR WITH
CURRENT TO AVOID THE CLOSING SPRING BEING RELOADED.
THE CIRCUIT BREAKER MUST NOT BE OPERATED AT A SF
6
PRESSURE GAS LOWER THAN THE MINIMAL PRESSURE FOR THE
INSULATION
p
me
.
Содержание SF6
Страница 2: ...Content Instruction Manual GE Information 04 2017 D1736EN 03 2 10 This page is intentionally blank...
Страница 50: ...Installation Tightening torques GE Information 07 2016 L31 001EN 03 4 4 This page is intentionally blank...
Страница 128: ...Installation Vacuum operation GE Information 08 2016 L31 881EN04 6 6 This page is intentionally blank...
Страница 176: ...Maintenance Maintenance plan GE Information 08 2016 L51 004EN 07 8 8 This page is intentionally blank...
Страница 178: ...Maintenance Electrical wear limits GE Information 08 2016 L51 052EN 05 2 2 This page is intentionally blank...
Страница 204: ...Annexes Tooling and accessories GE Information 08 2016 L60 028EN 04 8 8 This page is intentionally blank...
Страница 206: ...Grid Solutions This page is intentionally blank...
Страница 212: ...Grid Solutions This page is intentionally blank...
Страница 216: ...Grid Solutions This page is intentionally blank...
Страница 220: ...Grid Solutions This page is intentionally blank...
Страница 258: ...Installation Lifting and positioning the pole GE Information 08 2016 L31 200EN 07 4 4 This page is intentionally blank...
Страница 286: ...Installation Coupling of column and chambers GE Information L31 7138EN 02 16 16 11 2016 This page is intentionally blank...
Страница 299: ...GE Information This page is intentionally blank...
Страница 300: ......