Installation
Pre- filling with SF
6
gas at 0.05 MPa
GE Information
L31- 960EN/04
3/4
02- 2017
Pre- filling with SF
6
gas
Process
The table below gives the steps of the pre- filling with SF
6
gas operation :
Step
Action
Comment/Diagram
1
Remove the valve cap (5) of the
filling tool (4).
5
4
2
D
Open the SF
6
gas bottle tap (9).
D
Open and close the cock (11) of
the pressure reducer to eliminate
any air inside the tube (12)
(approx. 3 s at low flow- rate).
D
Close the SF
6
gas bottle tap (9).
9
11
12
Open
Closed
SF
6
3
Connect the tube (12) to the filling
tool (4).
12
4
4
Open the SF
6
gas bottle tap (9)
and adjust gas output by acting on
the cock (11) of the pressure
reducer (reduced flow rate).
D
Close the tap (9) from time to
time to check pressure on the
gauge (13).
D
Start filling again until the
required pressure about
0.05 MPa
is reached.
D
Close in this order : the tap (9),
then the cock (11).
9
13
Open
11
SF
6
Closed
END OF PROCEDURE
Содержание SF6
Страница 2: ...Content Instruction Manual GE Information 04 2017 D1736EN 03 2 10 This page is intentionally blank...
Страница 50: ...Installation Tightening torques GE Information 07 2016 L31 001EN 03 4 4 This page is intentionally blank...
Страница 128: ...Installation Vacuum operation GE Information 08 2016 L31 881EN04 6 6 This page is intentionally blank...
Страница 176: ...Maintenance Maintenance plan GE Information 08 2016 L51 004EN 07 8 8 This page is intentionally blank...
Страница 178: ...Maintenance Electrical wear limits GE Information 08 2016 L51 052EN 05 2 2 This page is intentionally blank...
Страница 204: ...Annexes Tooling and accessories GE Information 08 2016 L60 028EN 04 8 8 This page is intentionally blank...
Страница 206: ...Grid Solutions This page is intentionally blank...
Страница 212: ...Grid Solutions This page is intentionally blank...
Страница 216: ...Grid Solutions This page is intentionally blank...
Страница 220: ...Grid Solutions This page is intentionally blank...
Страница 258: ...Installation Lifting and positioning the pole GE Information 08 2016 L31 200EN 07 4 4 This page is intentionally blank...
Страница 286: ...Installation Coupling of column and chambers GE Information L31 7138EN 02 16 16 11 2016 This page is intentionally blank...
Страница 299: ...GE Information This page is intentionally blank...
Страница 300: ......