Grid Solutions
PS 0003EN
04
G. BERNARD
1998-08-12
J. VIAT
2011-03-21
1 / 3
Sheet N°
Revision Written by
Date
Signature Approved by
Date
Signature Page
SAFETY SHEET
PRESSURIZED EQUIPMENT
CAUSE OR ORIGIN OF HAZARD
.
Our equipment includes gas pressure assemblies (SF
6
, nitrogen, air, etc.) or fluids (oil).
WORK REQUIREMENTS.
Comply with the storage, transport and operating instructions supplied with our equipment.
Before initial filling and pressurizing, check the overall condition of the shielding concerned :
- no signs of impact, splitting or chipping on the porcelain components, etc.,
- no visible damage to hoses and/or rigid pipes (cuts, folds, corrosion, etc.) or to fittings and metal
protection (accumulators, tank, etc.).
SAFETY INSTRUCTIONS
.
OBSERVE ALL GENERAL INSTRUCTIONS GOVERNING INSTALLATION, COMMISSIONING AND
OPERATION IN ACCORDANCE WITH CURRENTLY ACCEPTED PRACTICES AS WELL AS THOSE LAID
DOWN IN THE DOCUMENTATION SUPPLIED WITH THE EQUIPMENT.
As a general rule, all work on pressurized equipment must be carried out by qualified personnel.
Содержание SF6
Страница 2: ...Content Instruction Manual GE Information 04 2017 D1736EN 03 2 10 This page is intentionally blank...
Страница 50: ...Installation Tightening torques GE Information 07 2016 L31 001EN 03 4 4 This page is intentionally blank...
Страница 128: ...Installation Vacuum operation GE Information 08 2016 L31 881EN04 6 6 This page is intentionally blank...
Страница 176: ...Maintenance Maintenance plan GE Information 08 2016 L51 004EN 07 8 8 This page is intentionally blank...
Страница 178: ...Maintenance Electrical wear limits GE Information 08 2016 L51 052EN 05 2 2 This page is intentionally blank...
Страница 204: ...Annexes Tooling and accessories GE Information 08 2016 L60 028EN 04 8 8 This page is intentionally blank...
Страница 206: ...Grid Solutions This page is intentionally blank...
Страница 212: ...Grid Solutions This page is intentionally blank...
Страница 216: ...Grid Solutions This page is intentionally blank...
Страница 220: ...Grid Solutions This page is intentionally blank...
Страница 258: ...Installation Lifting and positioning the pole GE Information 08 2016 L31 200EN 07 4 4 This page is intentionally blank...
Страница 286: ...Installation Coupling of column and chambers GE Information L31 7138EN 02 16 16 11 2016 This page is intentionally blank...
Страница 299: ...GE Information This page is intentionally blank...
Страница 300: ......