Grid Solutions SAS
21 rue Cyprian
69611 VILLEURBANNE Cedex
France
Service Qualité
RAPPORT D’ESSAIS AVANT MISE EN SERVICE
Page /
Página
9/12
Quality Department
COMMISSIONING TEST REPORT
Servicio de calidad
RELACIÓN DE ENSAYOS ANTES DE LA PUESTA EN SERVICIO
EB3 90 020-D4 RES 310M
014
29/03/2017
N° d’Instruction
Indice
Date de révision
MESURAGE DES ÉCARTS DE SIMULTANÉITÉ
COINCIDENCE DEVIATION MEASUREMENT
ms
MEDICIÓN DE LAS DESVIATIONES DE SIMULTANEIDAD
Phase/Phase/Fase
Phase/Phase/Fase
Phase/Phase/Fase
Entre éléments de coupure
d’une même phase
Between breaking elements
of a same phase
Entre elementos de interrupción
de un mismo fase
Fermeture
Closing
Cierre
______
______
______
Ouverture voie 1
Opening way 1
Apertura via 1
______
______
______
Ouverture voie 2
Opening way 2
Apertura via 2
______
______
______
Entre phases
Between phases
Entre fases
Fermeture
Closing
Cierre
______
Ouverture voie 1
Opening way 1
Apertura via 1
______
Ouverture voie 2
Opening way 2
Apertura via 2
______
MESURAGE DES DURÉES DE FONCTIONNEMENT DES CONTACTS AUXILIAIRES
MEASUREMENT OF AUXILIARY CONTACT OPERATING DURATIONS
ms
MEDICIÓN DE DURACIONES DE FUNCIONAMIENTO DE LOS CONTACTOS AUXILIARES
Type de contact
Contact type
Tipo de contacto
Phase/
Phase/
Fase
Phase/
Phase/
Fase
Phase/
Phase/
Fase
Manœuvre
de
fermeture
Closing operation
Maniobra de cierre
52b
______
______
______
______
______
______
52a
______
______
______
______
______
______
Manœuvre
d’ouverture
Opening operation
Maniobra de apertura
52b
______
______
______
______
______
______
52a
______
______
______
______
______
______
Содержание SF6
Страница 2: ...Content Instruction Manual GE Information 04 2017 D1736EN 03 2 10 This page is intentionally blank...
Страница 50: ...Installation Tightening torques GE Information 07 2016 L31 001EN 03 4 4 This page is intentionally blank...
Страница 128: ...Installation Vacuum operation GE Information 08 2016 L31 881EN04 6 6 This page is intentionally blank...
Страница 176: ...Maintenance Maintenance plan GE Information 08 2016 L51 004EN 07 8 8 This page is intentionally blank...
Страница 178: ...Maintenance Electrical wear limits GE Information 08 2016 L51 052EN 05 2 2 This page is intentionally blank...
Страница 204: ...Annexes Tooling and accessories GE Information 08 2016 L60 028EN 04 8 8 This page is intentionally blank...
Страница 206: ...Grid Solutions This page is intentionally blank...
Страница 212: ...Grid Solutions This page is intentionally blank...
Страница 216: ...Grid Solutions This page is intentionally blank...
Страница 220: ...Grid Solutions This page is intentionally blank...
Страница 258: ...Installation Lifting and positioning the pole GE Information 08 2016 L31 200EN 07 4 4 This page is intentionally blank...
Страница 286: ...Installation Coupling of column and chambers GE Information L31 7138EN 02 16 16 11 2016 This page is intentionally blank...
Страница 299: ...GE Information This page is intentionally blank...
Страница 300: ......