Grid Solutions SAS
21 rue Cyprian
69611 VILLEURBANNE Cedex
France
Service Qualité
RAPPORT D’ESSAIS AVANT MISE EN SERVICE
Page /
Página
12/12
Quality Department
COMMISSIONING TEST REPORT
Servicio de calidad
RELACIÓN DE ENSAYOS ANTES DE LA PUESTA EN SERVICIO
EB3 90 020-D4 RES 310M
014
29/03/2017
N° d’Instruction
Indice
Date de révision
ESSAIS DE TENUE
À LA TENSION DES CIRCUITS AUXILIAIRES ET DE COMMANDE
VOLTAGE WITHSTAND TESTS ON AUXILIARY AND CONTROL CIRCUITS
ENSAYOS DE TENSIÓN SOPORTADA DE LOS CIRCUITOS AUXLIARES Y DE MANDO
Test Non applicable/ Test Not applicable/ Ensayo No aplicable
Test réalisé en usine/Test performed in factory/Ensayos realizados en fabrica
INDICATION/INDICATION/INDICACION
Dans le cas des appareils en T un minimum de 50 manœuvres doit être réalisées sur site.
D'après norme CEI
62271-100 pour validation des accouplements réalisés sur site.
For the T shaped breakers a minimum of 50 operations has to be done on site.
According to IEC 62271-100 standard to validate coupling made on site.
En el caso de interruptores en T, se debe llevar a cabo un mínimo de 50 maniobras en la obra.
de acuerdo con la norma IEC 62271-110 para validación de los acoplamientos realizados en la obra.
OBSERVATIONS
–
REMARKS
–
OBSERVACIONES
Grid Solutions
Client
/ Customer /
Cliente
Date des essais de mise en service
Commissioning date
____________
Fecha de puebras para puesta en servicio
Réalisés par
Performed by
____________
Realizado por
Pour le client
For the customer
_______________
Para el cliente
Содержание SF6
Страница 2: ...Content Instruction Manual GE Information 04 2017 D1736EN 03 2 10 This page is intentionally blank...
Страница 50: ...Installation Tightening torques GE Information 07 2016 L31 001EN 03 4 4 This page is intentionally blank...
Страница 128: ...Installation Vacuum operation GE Information 08 2016 L31 881EN04 6 6 This page is intentionally blank...
Страница 176: ...Maintenance Maintenance plan GE Information 08 2016 L51 004EN 07 8 8 This page is intentionally blank...
Страница 178: ...Maintenance Electrical wear limits GE Information 08 2016 L51 052EN 05 2 2 This page is intentionally blank...
Страница 204: ...Annexes Tooling and accessories GE Information 08 2016 L60 028EN 04 8 8 This page is intentionally blank...
Страница 206: ...Grid Solutions This page is intentionally blank...
Страница 212: ...Grid Solutions This page is intentionally blank...
Страница 216: ...Grid Solutions This page is intentionally blank...
Страница 220: ...Grid Solutions This page is intentionally blank...
Страница 258: ...Installation Lifting and positioning the pole GE Information 08 2016 L31 200EN 07 4 4 This page is intentionally blank...
Страница 286: ...Installation Coupling of column and chambers GE Information L31 7138EN 02 16 16 11 2016 This page is intentionally blank...
Страница 299: ...GE Information This page is intentionally blank...
Страница 300: ......