Identify the equipment to be worked on and ensure it is
switched off.
X
X
X
Obtain as much information as possible from the user
regarding the condition of the unit.
X
X
X
Check that the unit is earthed both upstream and
downstream.
X
X
X
Demarcate the work area.
X
X
X
Ensure that the operator is equipped with the personal
protective clothes and equipment required (safety glasses,
gloves, safety boots, harness, etc.).
X
X
X
Ensure that the equipment used is compliant and in good
condition (scaffolding, slings, suspended platforms, electrical
equipment, tools, etc.).
X
X
X
Ensure that the safety instructions in respect of each
particular hazard are complied with.
X
X
X
Содержание SF6
Страница 2: ...Content Instruction Manual GE Information 04 2017 D1736EN 03 2 10 This page is intentionally blank...
Страница 50: ...Installation Tightening torques GE Information 07 2016 L31 001EN 03 4 4 This page is intentionally blank...
Страница 128: ...Installation Vacuum operation GE Information 08 2016 L31 881EN04 6 6 This page is intentionally blank...
Страница 176: ...Maintenance Maintenance plan GE Information 08 2016 L51 004EN 07 8 8 This page is intentionally blank...
Страница 178: ...Maintenance Electrical wear limits GE Information 08 2016 L51 052EN 05 2 2 This page is intentionally blank...
Страница 204: ...Annexes Tooling and accessories GE Information 08 2016 L60 028EN 04 8 8 This page is intentionally blank...
Страница 206: ...Grid Solutions This page is intentionally blank...
Страница 212: ...Grid Solutions This page is intentionally blank...
Страница 216: ...Grid Solutions This page is intentionally blank...
Страница 220: ...Grid Solutions This page is intentionally blank...
Страница 258: ...Installation Lifting and positioning the pole GE Information 08 2016 L31 200EN 07 4 4 This page is intentionally blank...
Страница 286: ...Installation Coupling of column and chambers GE Information L31 7138EN 02 16 16 11 2016 This page is intentionally blank...
Страница 299: ...GE Information This page is intentionally blank...
Страница 300: ......