Circuit- breaker
general preparing
The table below gives the steps to prepare the circuit- breaker to work safely :
Step
Action
Comment
1
Isolate the circuit- breaker from
the network.
Shut down the circuit- breaker,
de- energize and earth it.
2
Switch- off the supply circuit of
the reloading motor.
3
Check the SF
6
pressure gas.
Make sure that the SF
6
pressure
gas is
p
me
.
Below this level, no mechanical
operating is allowed.
Release the springs
The table below gives the procedure to release the closing spring and the
opening spring depending the circuit- breaker state :
If the circuit- breaker
position is ...
Action
Closed
In the operating device, activate the
opening handle and the closing han-
dle like below :
1
- Open
2
- Close
3
- Open
Open
Activate the closing handle and the
opening handle like below :
1
- Close
2
- Open
Check the optical
signalization
Check that the operating mechanism’s optical signalization shows the sym-
bols below :
Circuit- breaker
Open
Closing spring
Released
Содержание SF6
Страница 2: ...Content Instruction Manual GE Information 04 2017 D1736EN 03 2 10 This page is intentionally blank...
Страница 50: ...Installation Tightening torques GE Information 07 2016 L31 001EN 03 4 4 This page is intentionally blank...
Страница 128: ...Installation Vacuum operation GE Information 08 2016 L31 881EN04 6 6 This page is intentionally blank...
Страница 176: ...Maintenance Maintenance plan GE Information 08 2016 L51 004EN 07 8 8 This page is intentionally blank...
Страница 178: ...Maintenance Electrical wear limits GE Information 08 2016 L51 052EN 05 2 2 This page is intentionally blank...
Страница 204: ...Annexes Tooling and accessories GE Information 08 2016 L60 028EN 04 8 8 This page is intentionally blank...
Страница 206: ...Grid Solutions This page is intentionally blank...
Страница 212: ...Grid Solutions This page is intentionally blank...
Страница 216: ...Grid Solutions This page is intentionally blank...
Страница 220: ...Grid Solutions This page is intentionally blank...
Страница 258: ...Installation Lifting and positioning the pole GE Information 08 2016 L31 200EN 07 4 4 This page is intentionally blank...
Страница 286: ...Installation Coupling of column and chambers GE Information L31 7138EN 02 16 16 11 2016 This page is intentionally blank...
Страница 299: ...GE Information This page is intentionally blank...
Страница 300: ......