Maintenance
Maintenance plan
GE Information
08- 2016
L51- 004EN/07
3/8
Maintenance operations
Guide
The table below is a guide of the operations to be carried out at each
maintenance stage:
(M1) MAINTENANCE VISITS
(1 or 2 times a year)
(M2) INSPECTION
(every 5 years)
(M4) OVERHAUL
(OPERATING TIME: 20 years)
(M4) OVERHAUL
(MECHANICAL OPERATIONS:
3 000
cycles)
(M4) OVERHAUL
(ELECTRICAL WEAR: see
“Electrical wear limits”)
■ ■ ■ ■ ■
Operation counter reading.
■ ■ ■
Overall
inspection:
appearance
(corrosion,
paintwork, signs of overheating).
■ ■ ■ ■ ■
Check operation of permanent heating. Check
condition of air vents.
■ ■ ■
If the circuit- breaker is fitted with an SF
6
dial
densimeter or a pressure gauge, check SF
6
pressure (or SF
6
+CF
4
gas mixture).
■
It is advisable to perform at least 2 CO duty cycles
per year,
when apparatus are scarcely used
, in
order to check that circuit- breaker and associated
control circuits are working properly.
■ ■
Check SF
6
densimeter thresholds. Then adjust
pressure to its rated value.
■ ■ ■
Check tightening of parts not subjected to pressure
(frame - deck - cubicle).
■ ■ ■ ■
Check tightening of low voltage terminals (
*
6
months after commissioning).
■ ■ ■
Check relay operation.
■
Change door seal, side panels seal and roof seal.
■ ■ ■ ■
Measure operating times for poles and auxiliary
contacts.
■ ■ ■ ■
Carry out operations at recommended duties and
rated voltage.
■ ■
Change (or recondition) interrupting chambers.
■
Check that the damper piston for the opening of the
control presents no oil leak.
Continued on next page.
Содержание SF6
Страница 2: ...Content Instruction Manual GE Information 04 2017 D1736EN 03 2 10 This page is intentionally blank...
Страница 50: ...Installation Tightening torques GE Information 07 2016 L31 001EN 03 4 4 This page is intentionally blank...
Страница 128: ...Installation Vacuum operation GE Information 08 2016 L31 881EN04 6 6 This page is intentionally blank...
Страница 176: ...Maintenance Maintenance plan GE Information 08 2016 L51 004EN 07 8 8 This page is intentionally blank...
Страница 178: ...Maintenance Electrical wear limits GE Information 08 2016 L51 052EN 05 2 2 This page is intentionally blank...
Страница 204: ...Annexes Tooling and accessories GE Information 08 2016 L60 028EN 04 8 8 This page is intentionally blank...
Страница 206: ...Grid Solutions This page is intentionally blank...
Страница 212: ...Grid Solutions This page is intentionally blank...
Страница 216: ...Grid Solutions This page is intentionally blank...
Страница 220: ...Grid Solutions This page is intentionally blank...
Страница 258: ...Installation Lifting and positioning the pole GE Information 08 2016 L31 200EN 07 4 4 This page is intentionally blank...
Страница 286: ...Installation Coupling of column and chambers GE Information L31 7138EN 02 16 16 11 2016 This page is intentionally blank...
Страница 299: ...GE Information This page is intentionally blank...
Страница 300: ......