ÉCART ENTRE CHAMBRES D'UN MÊME POLE (en ms à tension assignée)
DEVIATIONS BETWEEN CHAMBERS OF THE SAME POLE (in ms at rated voltage)
MANOEUVRE
OPERATION
Maximum
Fermeture -
Closing
2
Ouverture -
Opening
2
ÉCART ENTRE POLES
(en ms à tension assignée)
DEVIATIONS BETWEEN POLES (in ms at rated voltage)
MANOEUVRE
OPERATION
Maximum
Fermeture -
Closing
5
Ouverture -
Opening
3
DURÉES DE REARME
(en s à tension assignée)
CHARGING TIME
(in s at rated voltage)
Tension Moteur en V
Motor Voltage in V
Maximum
toutes
all
10
RESISTANCE DE CONTACT DU CIRCUIT PRINCIPAL (sans prise de courant)
(en
µΩ
sous courant continu de 100 A)
MAIN CIRCUIT RESISTANCE (without HV terminal)
(in
µΩ
with a 100 A direct courrent)
Type de chambre
Type of chamber
Maximum
105/ 4
90
105/ 5
93
105/ 7
95
105/ 11
93
105/12
95
105/13
93
CA 103 171-3
12/02/2002
009
20/01/2017
6/6
N° d’Instruction
Date d’émission
Indice
Date de révision
Page
Ce document est propriété exclusive de GE et ne doit pas être utilisé, copié ou communiqué à des tiers sans son autorisation
Содержание SF6
Страница 2: ...Content Instruction Manual GE Information 04 2017 D1736EN 03 2 10 This page is intentionally blank...
Страница 50: ...Installation Tightening torques GE Information 07 2016 L31 001EN 03 4 4 This page is intentionally blank...
Страница 128: ...Installation Vacuum operation GE Information 08 2016 L31 881EN04 6 6 This page is intentionally blank...
Страница 176: ...Maintenance Maintenance plan GE Information 08 2016 L51 004EN 07 8 8 This page is intentionally blank...
Страница 178: ...Maintenance Electrical wear limits GE Information 08 2016 L51 052EN 05 2 2 This page is intentionally blank...
Страница 204: ...Annexes Tooling and accessories GE Information 08 2016 L60 028EN 04 8 8 This page is intentionally blank...
Страница 206: ...Grid Solutions This page is intentionally blank...
Страница 212: ...Grid Solutions This page is intentionally blank...
Страница 216: ...Grid Solutions This page is intentionally blank...
Страница 220: ...Grid Solutions This page is intentionally blank...
Страница 258: ...Installation Lifting and positioning the pole GE Information 08 2016 L31 200EN 07 4 4 This page is intentionally blank...
Страница 286: ...Installation Coupling of column and chambers GE Information L31 7138EN 02 16 16 11 2016 This page is intentionally blank...
Страница 299: ...GE Information This page is intentionally blank...
Страница 300: ......