Chapter 4 Installation and Wiring
PAGE 4-30
4-A.
If connection with the Unit is successful, the “Connect” indication changes from
“Disconnect” to “[****]=[Connect]” (where **** is the IP address set in procedure 2.) is
displayed at the lower left status bar of the User Console. After connection succeeds,
reading and writing of respective set values, monitoring of fastening result indications,
etc. can be executed.
4-B. If connection with the controller
fails, “Connection to IP address **** failed.” (where **** is
the IP address set in procedure 2.) is displayed and “[****]=[Connection Failure]” is
displayed at the lower left status bar of the User Console.
If another PC is already connected to the controller when Procedure 3 is
executed, “A communication error has occurred. Please confirm the
communication status.” is displayed and thereafter, “Unconnected” is
displayed at the lower left status bar of the User Console software screen.
Caution
Содержание Handheld Nutrunner HFC3000
Страница 2: ...www fec usa com Copyright 2017 FEC AUTOMATION SYSTEMS All Rights Reserved ...
Страница 14: ...Notes ...
Страница 15: ...Chapter 1 Outline PAGE 1 1 Chapter 1 Outline 1 ...
Страница 21: ...Chapter 2 Specifications PAGE 2 1 Chapter 2 Specifications 2 ...
Страница 28: ...Chapter 2 Specifications PAGE 2 8 Blank Page ...
Страница 29: ...Chapter 3 Sysytem Description PAGE 3 1 Chapter 3 System Description 3 ...
Страница 36: ...Chapter 3 System Description PAGE 3 8 Memo ...
Страница 37: ...Chapter 4 Installation and Wiring PAGE 4 1 Chapter 4 Installation Wiring 4 ...
Страница 67: ...Chapter 5 Power Up and Operational Tests PAGE 5 1 Chapter 5 Power Up and Operational Tests 5 ...
Страница 71: ...Chapter 6 Fastening Operation PAGE 6 1 Chapter 6 Fastening Operation 6 ...
Страница 151: ...Chapter 7 Troubleshooting PAGE 7 1 Chapter 7 Troubleshooting 7 ...
Страница 169: ...Chapter 8 Options PAGE 8 1 Chapter 8 Options 8 ...
Страница 181: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 1 Chapter 9 Fieldbus I O Interfaces 9 ...
Страница 207: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 27 9 3 2 Description of the hardware RUN LED ERROR LED CC Link Connector ...
Страница 229: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 49 Blank Page ...
Страница 230: ......
Страница 231: ......