Chapter 7 Troubleshooting
PAGE 7-16
7-4. Ethernet Communication
If Ethernet communication of the HFC Software cannot be performed with the PC being used, please
refer to the following troubleshooting table.
Item
Countermeasures/Check Details
PAGE
Is there an error in the TCP/IP
setting procedures?
Check the TCP/IP setup procedures.
Section
4-8
Is there any problem with the
PC communication cable?
・
If the PC and the controller are to be
connected without an ethernet switch/
hub, try using a crossover ethernet
cable.
・
If connection is to be made with an
ethernet switch/hub, use a (Standard)
straight etherent cable.
・
Select a LAN cable of category 5e or
higher.
Section
4-8
Is network connection enabled
in the PC to be used for
Ethernet communication?
・
Set up the PC to enable network
connection or check with another PC.
-
Confirm by Command Prompt
functions
・
The PC
’s ethernet setting can be
confirmed by Command Prompt
functions.
Next page
Is PC connected with a wired LAN
and wireless LAN from the PC at
the same time?
・
Disconnect the wireless LAN.
If data is not output correctly even though there are no problems with communication, please refer to
the following table.
Item
Countermeasures/Check Details
PAGE
Data is not output at all
・
Confirm that the protocol by which the
data output is to be performed is
correctly set.
Next page
・
If the START signal is turned OFF
before 1ST torque or 1ST angle is
detected after starting tightening
operation, data will not be output.
Содержание Handheld Nutrunner HFC3000
Страница 2: ...www fec usa com Copyright 2017 FEC AUTOMATION SYSTEMS All Rights Reserved ...
Страница 14: ...Notes ...
Страница 15: ...Chapter 1 Outline PAGE 1 1 Chapter 1 Outline 1 ...
Страница 21: ...Chapter 2 Specifications PAGE 2 1 Chapter 2 Specifications 2 ...
Страница 28: ...Chapter 2 Specifications PAGE 2 8 Blank Page ...
Страница 29: ...Chapter 3 Sysytem Description PAGE 3 1 Chapter 3 System Description 3 ...
Страница 36: ...Chapter 3 System Description PAGE 3 8 Memo ...
Страница 37: ...Chapter 4 Installation and Wiring PAGE 4 1 Chapter 4 Installation Wiring 4 ...
Страница 67: ...Chapter 5 Power Up and Operational Tests PAGE 5 1 Chapter 5 Power Up and Operational Tests 5 ...
Страница 71: ...Chapter 6 Fastening Operation PAGE 6 1 Chapter 6 Fastening Operation 6 ...
Страница 151: ...Chapter 7 Troubleshooting PAGE 7 1 Chapter 7 Troubleshooting 7 ...
Страница 169: ...Chapter 8 Options PAGE 8 1 Chapter 8 Options 8 ...
Страница 181: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 1 Chapter 9 Fieldbus I O Interfaces 9 ...
Страница 207: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 27 9 3 2 Description of the hardware RUN LED ERROR LED CC Link Connector ...
Страница 229: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 49 Blank Page ...
Страница 230: ......
Страница 231: ......