Operation/Adjustment
Never operate the equipment with wet hands.
Failure to observe this instruction may cause electric shock.
Use the equipment under the following conditions.
◆
Ambient temperature: 0°C~+45°C (Avoid freezing)
◆
Ambient humidity: 90% RH or lower (Avoid moisture)
◆
Atmosphere: Indoors (Avoid direct sunlight)
No corrosive gases or flammable gases
No oil mist, dust, water, salt, iron powder
◆
Avoid direct vibration or shocks.
Failure to meet these conditions may cause earth leakage and malfunction.
Confirm and adjust all parameters before operation in order to prevent unexpected movement
of the equipment.
Failure to observe this instruction may cause an injury, malfunction, or fault.
Never conduct extreme adjustments or setting change that may cause instability of operation.
Failure to observe this instruction may cause an injury, malfunction, or fault.
Do not turn ON and OFF the equipment repeatedly. Failure to observe this instruction may
cause a malfunction.
Do not use the equipment at a torque higher than the maximum torque.
Failure to observe this instruction may shorten equipment life or cause breakage due to high
temperature caused by overload.
In case any abnormality occurs, remove the cause and ensure safety before resetting and
restarting the equipment.
Failure to observe this instruction may cause injury.
It is occurred reaction in sudden rise torque in the following cases.
Please attach the reaction jig.
Retightening bolt(nut) which already tighten.
Loosing bolt(nut) which already tighten.
Caution
Safety Precautions
Содержание Handheld Nutrunner HFC3000
Страница 2: ...www fec usa com Copyright 2017 FEC AUTOMATION SYSTEMS All Rights Reserved ...
Страница 14: ...Notes ...
Страница 15: ...Chapter 1 Outline PAGE 1 1 Chapter 1 Outline 1 ...
Страница 21: ...Chapter 2 Specifications PAGE 2 1 Chapter 2 Specifications 2 ...
Страница 28: ...Chapter 2 Specifications PAGE 2 8 Blank Page ...
Страница 29: ...Chapter 3 Sysytem Description PAGE 3 1 Chapter 3 System Description 3 ...
Страница 36: ...Chapter 3 System Description PAGE 3 8 Memo ...
Страница 37: ...Chapter 4 Installation and Wiring PAGE 4 1 Chapter 4 Installation Wiring 4 ...
Страница 67: ...Chapter 5 Power Up and Operational Tests PAGE 5 1 Chapter 5 Power Up and Operational Tests 5 ...
Страница 71: ...Chapter 6 Fastening Operation PAGE 6 1 Chapter 6 Fastening Operation 6 ...
Страница 151: ...Chapter 7 Troubleshooting PAGE 7 1 Chapter 7 Troubleshooting 7 ...
Страница 169: ...Chapter 8 Options PAGE 8 1 Chapter 8 Options 8 ...
Страница 181: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 1 Chapter 9 Fieldbus I O Interfaces 9 ...
Страница 207: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 27 9 3 2 Description of the hardware RUN LED ERROR LED CC Link Connector ...
Страница 229: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 49 Blank Page ...
Страница 230: ......
Страница 231: ......