Chapter 9 Fieldbus I/O Interfaces
PAGE 9-12
●
List of LED Indications
The module LEDs indicate the node status of the AFC3000 Ethernet-I/P System and the network state.
9-2-3 I/O Signal Specifications
I/O Input/Output
Message Input/Output
Controller to PLC
PLC to Controller
Controller to PLC
PLC to Controller
Maximum
Setting
32 bytes (256 bits)
8 bytes (64 bits)
4096 bytes
32bytes
Standard
Setting
16 bytes (128 bits)
8 bytes (64 bits)
200 bytes
32bytes
LED
Color
State
Details
A
Network
Status
LED
Off
Off
Offline
Offline, No power or no IP address
Gree
n
Lit up
Online
Online, One or more connections established
Flash
Communication not
established
online, connection is not establishe
Red
Lit up
Error
Fatal error has occurred. / Conflicting IP address.
Flash Connection timeout
One or more connection timeout has occurred
B
Module
Status
LED
Off
Off
Power OFF
Power is not supplied.
Gree
n
Lit up
Online
Controlled by a scanner in RUN state -
Flash
Communication not
established
Incomplete / wrong configuration or scanner in idle
state
Red
Lit up
Error
Major Fault -A critical error has occurred.
Flash Error
A recoverable error has occurred.
C
Link
Activity
LED
Off
Off
Link not established
ETHERNET link is not established and
communication is not performed.
Gree
n
Lit up
Link Established
ETHERNET link is established but not
communicating
Flash Communicating
ETHERNET link is established and communication
is in progress.
A : Network
Status LED
B : Module
Status LED
C : Link
Activity LED
Содержание Handheld Nutrunner HFC3000
Страница 2: ...www fec usa com Copyright 2017 FEC AUTOMATION SYSTEMS All Rights Reserved ...
Страница 14: ...Notes ...
Страница 15: ...Chapter 1 Outline PAGE 1 1 Chapter 1 Outline 1 ...
Страница 21: ...Chapter 2 Specifications PAGE 2 1 Chapter 2 Specifications 2 ...
Страница 28: ...Chapter 2 Specifications PAGE 2 8 Blank Page ...
Страница 29: ...Chapter 3 Sysytem Description PAGE 3 1 Chapter 3 System Description 3 ...
Страница 36: ...Chapter 3 System Description PAGE 3 8 Memo ...
Страница 37: ...Chapter 4 Installation and Wiring PAGE 4 1 Chapter 4 Installation Wiring 4 ...
Страница 67: ...Chapter 5 Power Up and Operational Tests PAGE 5 1 Chapter 5 Power Up and Operational Tests 5 ...
Страница 71: ...Chapter 6 Fastening Operation PAGE 6 1 Chapter 6 Fastening Operation 6 ...
Страница 151: ...Chapter 7 Troubleshooting PAGE 7 1 Chapter 7 Troubleshooting 7 ...
Страница 169: ...Chapter 8 Options PAGE 8 1 Chapter 8 Options 8 ...
Страница 181: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 1 Chapter 9 Fieldbus I O Interfaces 9 ...
Страница 207: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 27 9 3 2 Description of the hardware RUN LED ERROR LED CC Link Connector ...
Страница 229: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 49 Blank Page ...
Страница 230: ......
Страница 231: ......