Chapter 6 Fastening Operation
PAGE 6-35
2. Upon reaching 1ST Torque/Angle, 1
st
Time ends and 2
ND
Time begins. 1ST Torque/Angle is the shift point
from 1
st
Speed to 2
nd
Speed.
3. For a 2 step fastening, the system will fasten to Standard Torque/Angle using 2
nd
Speed during the
specified 2
nd
Time limits. Standard Torque/Angle must be reached within the 2
nd
Time Low/High Limits or
a reject will occur. The fastening result will output as REJECT (NG). (The time judgment cannot be
disabled.)
4. If the 2
nd
Torque/Angle is detected before the Standard Torque/Angle, the speed is switched from 2
nd
Speed to 3
rd
Speed.
For a 3 step fastening, the system will fasten to Standard Torque/Angle using 3
rd
Torque Speed during the
specified 2
nd
Time Limits. Standard Torque/Angle must be reached within the 2
nd
Time Low/High Limits or
a reject will occur. The fastening result will output as REJECT (NG). (The time judgment cannot be
disabled.)
・
If D-No. 109 [2nd Torque] is set to 95 ~ 100% of D-No. 103 [Standard Torque], the fastening speed
is automatically set to 3rpm after the detection of the 2nd torque.
・
Use of this function is not recommended for fastening a soft joint. The abnormal state signal
A.08-
10 “Overload Error” may be generated.
402: 1st Speed
504: Rundown Revolution High Limit
404: 3rd Speed
403: 2nd Speed
503: Rundown Revolution Low Limit
500: Freerun Revolutions
310: Initial Time
315: Torque
Recovery Time
1st Time
2nd Time
400: Initial Speed
401: Freerun Speed
2
4
3
Caution
Содержание Handheld Nutrunner HFC3000
Страница 2: ...www fec usa com Copyright 2017 FEC AUTOMATION SYSTEMS All Rights Reserved ...
Страница 14: ...Notes ...
Страница 15: ...Chapter 1 Outline PAGE 1 1 Chapter 1 Outline 1 ...
Страница 21: ...Chapter 2 Specifications PAGE 2 1 Chapter 2 Specifications 2 ...
Страница 28: ...Chapter 2 Specifications PAGE 2 8 Blank Page ...
Страница 29: ...Chapter 3 Sysytem Description PAGE 3 1 Chapter 3 System Description 3 ...
Страница 36: ...Chapter 3 System Description PAGE 3 8 Memo ...
Страница 37: ...Chapter 4 Installation and Wiring PAGE 4 1 Chapter 4 Installation Wiring 4 ...
Страница 67: ...Chapter 5 Power Up and Operational Tests PAGE 5 1 Chapter 5 Power Up and Operational Tests 5 ...
Страница 71: ...Chapter 6 Fastening Operation PAGE 6 1 Chapter 6 Fastening Operation 6 ...
Страница 151: ...Chapter 7 Troubleshooting PAGE 7 1 Chapter 7 Troubleshooting 7 ...
Страница 169: ...Chapter 8 Options PAGE 8 1 Chapter 8 Options 8 ...
Страница 181: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 1 Chapter 9 Fieldbus I O Interfaces 9 ...
Страница 207: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 27 9 3 2 Description of the hardware RUN LED ERROR LED CC Link Connector ...
Страница 229: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 49 Blank Page ...
Страница 230: ......
Страница 231: ......