Table of Contents
4-8 Ethernet Interface
4-25
4-8-1 TCP/IP Setup Procedure
4-26
4-8-2 TCP/IP Setup Procedure (HFC3000 User Console Software)
4-29
Chapter 5: Power Up and Operational Tests
5-1 Items to be Checked Before Power On
5-2
5-2 Items to be Checked When Powering On the Equipment
5-3
5-3 Input Initial Setting Data
5-4
Chapter 6 Fastening Operation
6-1 Changing between RUN and PROGRAM Modes
6-2
6-2 RUN Mode
6-5
6-2-1 Changing Display Modes (in the RUN Mode)
6-6
6-2-2 Real Time Display Mode
6-7
6-2-3 Fastening Result Display Mode
6-10
6-2-4 Parameter Setting Mode
6-12
6-2-5 System Parameter Display Mode
6-13
6-2-6 Status Display Mode
6-14
6-3 Parameter Program Mode
6-16
6-3-1 Changing Modes in the PROGRAM Mode
6-16
6-3-2 Parameter Selection Mode
6-17
6-3-3 Parameter Editing Mode
6-19
6-4 Parameter Copy/Erasing the Fastening Result History/Formatting of the CF Card
6-21
6-5 Fastening Reject (NG) Result Indications
6-23
6-5-1 Example of Fastening Reject item Display
6-24
6-5-2 Reject Judgment / Limits
6-26
6-5-3 Fastening Speed and Time
6-34
6-5-4 Auxiliary Attachments
– Tubenut Head Setup
6-36
6-6 Parameter Structure
6-39
6-6-1 System Parameters
6-40
6-6-2 Fastening Parameters (
Torque, Angle, Rate, Time, Speed, Rev/Current, other)
6-55
6-6-3 Pulse Operation
6-75
6-6-4 Gyro Operation
6-77
6-6-5 Sequence Operation
6-78
Chapter 7 Troubleshooting
7-1 Abnormal State Display
7-2
7-2 Abnormality Details/Causes and Recovery Methods
7-3
7-3 Spindle Judgment: Checking REJECT Reason
7-15
7-4 Ethernet Communication
7-16
7-5 RTC (Real Time Clock Setup)
7-18
Содержание Handheld Nutrunner HFC3000
Страница 2: ...www fec usa com Copyright 2017 FEC AUTOMATION SYSTEMS All Rights Reserved ...
Страница 14: ...Notes ...
Страница 15: ...Chapter 1 Outline PAGE 1 1 Chapter 1 Outline 1 ...
Страница 21: ...Chapter 2 Specifications PAGE 2 1 Chapter 2 Specifications 2 ...
Страница 28: ...Chapter 2 Specifications PAGE 2 8 Blank Page ...
Страница 29: ...Chapter 3 Sysytem Description PAGE 3 1 Chapter 3 System Description 3 ...
Страница 36: ...Chapter 3 System Description PAGE 3 8 Memo ...
Страница 37: ...Chapter 4 Installation and Wiring PAGE 4 1 Chapter 4 Installation Wiring 4 ...
Страница 67: ...Chapter 5 Power Up and Operational Tests PAGE 5 1 Chapter 5 Power Up and Operational Tests 5 ...
Страница 71: ...Chapter 6 Fastening Operation PAGE 6 1 Chapter 6 Fastening Operation 6 ...
Страница 151: ...Chapter 7 Troubleshooting PAGE 7 1 Chapter 7 Troubleshooting 7 ...
Страница 169: ...Chapter 8 Options PAGE 8 1 Chapter 8 Options 8 ...
Страница 181: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 1 Chapter 9 Fieldbus I O Interfaces 9 ...
Страница 207: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 27 9 3 2 Description of the hardware RUN LED ERROR LED CC Link Connector ...
Страница 229: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 49 Blank Page ...
Страница 230: ......
Страница 231: ......