Chapter 6 Fastening Operation
PAGE 6-57
Item
PAR No.
D-No.
Contents
Torque
Method
Angle
Method
Others
P.01
~
P.64
540
Number of Accept [times]
○
○
541
Angle Head Torque Variation Rate[%]
○
○
Time
[msec]
P.01
~
P.64
542
CW Servo Lock Time Between Steps
○
○
543
CW Wait Time Between Steps
○
○
544
Ramp Down Time
○
○
545
Final Ramp Down Time
○
○
546
Reverse Ramp Up Time
○
○
547
CCW Wait Time Between Steps
○
○
Others
P.01
~
P.64
548
Option
△
△
549
Option
△
△
Pulsing
P.01
~
P.64
550
Recovery Pulsing Count
○
○
551
Recovery Pulsing Speed [rpm]
○
○
552
Pulse Fastening Stop Servo Lock Time [ms]
○
○
553
Pulse Fastening Wait Time [ms]
○
○
554
Pulse Fastening Operation Time [ms]
○
○
555
Pulse Fastening Operation Angle [deg]
○
○
556
Pulse Fastening Ramp Up Time [ms]
○
○
Gyro
P.01
~
P.64
560
CW Swing Stop Angle [deg]
○
○
561
CW Swing Pause Angle [deg]
○
○
562
CW Swing Pause Servo Lock Time [ms]
○
○
563
CW Swing Resume Dwell Time [ms]
○
○
570
CCW Swing Stop Angle [deg]
○
○
571
CCW Swing Pause Angle [deg]
○
○
572
CCW Swing Pause Servo Lock Time [ms]
○
○
573
CCW Swing Resume Dwell Time [ms]
○
○
Sequence
P.01
~
P.64
580
Sequence Mode
○
○
581
Sequence Stage 1
○
○
582
Sequence Stage 2
○
○
583
Sequence Stage 3
○
○
584
Sequence Stage 4
○
○
585
Sequence Stage 5
○
○
586
Sequence Stage 6
○
○
587
Sequence Stage 7
○
○
588
Sequence Stage 8
○
○
Not Used
P.01
~
P.64
589 option
△
△
590 option
△
△
591 option
△
△
592 option
△
△
593 option
△
△
594 option
△
△
595 option
△
△
596 option
△
△
597 option
△
△
598 option
△
△
599 option
△
△
Содержание Handheld Nutrunner HFC3000
Страница 2: ...www fec usa com Copyright 2017 FEC AUTOMATION SYSTEMS All Rights Reserved ...
Страница 14: ...Notes ...
Страница 15: ...Chapter 1 Outline PAGE 1 1 Chapter 1 Outline 1 ...
Страница 21: ...Chapter 2 Specifications PAGE 2 1 Chapter 2 Specifications 2 ...
Страница 28: ...Chapter 2 Specifications PAGE 2 8 Blank Page ...
Страница 29: ...Chapter 3 Sysytem Description PAGE 3 1 Chapter 3 System Description 3 ...
Страница 36: ...Chapter 3 System Description PAGE 3 8 Memo ...
Страница 37: ...Chapter 4 Installation and Wiring PAGE 4 1 Chapter 4 Installation Wiring 4 ...
Страница 67: ...Chapter 5 Power Up and Operational Tests PAGE 5 1 Chapter 5 Power Up and Operational Tests 5 ...
Страница 71: ...Chapter 6 Fastening Operation PAGE 6 1 Chapter 6 Fastening Operation 6 ...
Страница 151: ...Chapter 7 Troubleshooting PAGE 7 1 Chapter 7 Troubleshooting 7 ...
Страница 169: ...Chapter 8 Options PAGE 8 1 Chapter 8 Options 8 ...
Страница 181: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 1 Chapter 9 Fieldbus I O Interfaces 9 ...
Страница 207: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 27 9 3 2 Description of the hardware RUN LED ERROR LED CC Link Connector ...
Страница 229: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 49 Blank Page ...
Страница 230: ......
Страница 231: ......