Test Setup - Test Configurator, Timer, and System
Power Blazer
239
Labels
VT/TU Path (V5)
: The V5 byte is allocated to indicate the content of the
VT/TU path, including the status of the mapped payloads.
Generated
: Select the V5 byte from the list. Selecting a V5 byte value
will automatically update the OH V5 selection and vice versa. Refer to
V5 on page 677 for more information.
PLM-V/UNEQ-V / LP-PLM/LP-UNEQ
: Enables the Payload Mismatch
and VT/TU UNEQ monitoring. This setting is coupled with the
configuration on the
Expected
: Select the expected V5 byte from the list. Refer to V5 on
page 677 for more information.
Содержание Power Blazer 88200NGE
Страница 1: ...www EXFO com User Guide 88000 Series Power Blazer HIGH SPEED MULTISERVICE TEST MODULE...
Страница 14: ......
Страница 20: ......
Страница 64: ...Test Setup Test Applications 54 88000 Series OTN BERT...
Страница 65: ...Test Setup Test Applications Power Blazer 55 OTN BERT OTU4 for 88200NGE 890 890NGE OTU4 for 88260...
Страница 71: ...Test Setup Test Applications Power Blazer 61 SONET SDH BERT For SDH BERT...
Страница 76: ...Test Setup Test Applications 66 88000 Series SONET SDH DSn PDH BERT For SDH...
Страница 620: ......
Страница 726: ......
Страница 752: ......
Страница 756: ......
Страница 768: ......
Страница 789: ...Glossary Power Blazer 779 10G Ethernet Client The following figure presents a typical network application...
Страница 803: ...Glossary Power Blazer 793 Ethernet Cables Straight Through Cable 1000 Mbit s Crossover Cable 1000 Mbit s...
Страница 847: ...Glossary Power Blazer 837 SONET DSn SDH PDH The GUI Grid indicates the TUG 2 x and TUG 3 x values...
Страница 886: ...0 5 1 5 48 5 0 176 W d y K y K D...