Commissioning
TOCII CA72TOC
32
Hauser
6
Commissioning
6.1
Function check
#
Warning!
• Check all connections for correctness.
• Make sure that the supply voltage is identical to the voltage indicated on the nameplate!
6.2
Start
6.2.1
Commissioning sequence
Preparation:
1.
Install the pH sensor in the strip chamber and connect the sensor cable to the amplifier.
2.
Remove the transportation lock (cable ties) on the furnace unlocking device.
3.
Insert the combustion pipe insert with the catalyst into the furnace (see the "Maintenance"
section) and install the heatable salt trap (optional).
4.
Mount the hose casettes (see the "Maintenance" section).
Starting the analyzer:
1.
Start the analyzer (see the "CLR start" section). The furnace begins to heat up.
2.
Place the stripping reagent and the C1 and C2 parent solutions (see the "Preparing the
chemicals" section) in the reagent tray under the analyzer.
3.
In the programming mode, configure the operating parameters of the analyzer.
4.
Adjust the pH sensor (> CALIBRATION > ADJUSTMENT pH SENSOR).
5.
Adjust the peristaltic pumps P1 and P4 (> PUMPS > REPLACE HOSE P1/4).
6.
Adjust the peristaltic pump P2 and determine the empty volume ( > PUMPS > ADJUST P2 and
> CALIBRATION > EMPTY VOLUME DOSING).
7.
Once the analyzer is in operation after the warm-up stage, check the gas circuit for leaks
(> CLEANING > LEAKAGE TEST).
8.
Perform a 2-point adjustment ( > CALIBRATION > ANALYZER ADJUSTMENT).
Содержание TOCII CA72TOC
Страница 2: ...Endress Hauser...
Страница 136: ...TOCII CA72TOC 136 Endress Hauser...
Страница 138: ...www endress com worldwide BA448C 07 en 06 10 71118197 Printed in Germany FM SGML 6 0 DT 71118197...
Страница 139: ......
Страница 140: ......