Installation
TOCII CA72TOC
14
Hauser
Sample supply
Sample is supplied via a 3/8" connection on the left side panel (item 11).
!
Note!
Additional connections are required if sample conditioning takes place (see instructions for sample
conditioning).
Analyzer sample drainage
Sample is drained off unpressurized via a DN 6/8 mm hose connection (compression fitting) on the
left side panel (item 12) into an open channel or pipe. Route the hose in such a way that
backpressure cannot form.
Condensate drainage
Condensate is drained off via a hose gland (PE, DN 1.6/3.2 mm, scope of delivery) on the left side
panel (item 10).
Acid connection
Place the acid cistern in the reagent tray. Connect the acid hose to the left side panel (item 9).
Connecting the standards
If the analyzer is fitted with a predilution system, place the standard containers in the holder on the
left side panel.
If the analyzer is not fitted with a predilution system, place the standard containers in the reagent
tray.
Connect the standards to the left side panel (C1 to item 8 and C2 to item 7).
Gas outlet
Gas escapes via a hose gland (DN 4/6 mm) on the left side panel (item 2).
Sample supply
Inlet (mm / inch)
Outlet (mm / inch)
PA2
40 / 1.57
50 / 1.97
PA3
20 / 0.79
32 / 1.26
PA9
20 / 0.79
32 / 1.26
Содержание TOCII CA72TOC
Страница 2: ...Endress Hauser...
Страница 136: ...TOCII CA72TOC 136 Endress Hauser...
Страница 138: ...www endress com worldwide BA448C 07 en 06 10 71118197 Printed in Germany FM SGML 6 0 DT 71118197...
Страница 139: ......
Страница 140: ......