Platform Safety-aerial EEC-0070
V1.3
Platform Safety
Aerial devices are designed and intended to be used for handling personnel. Guidance
on the use of aerial devices is from
ANSI/SIA A92.2
(latest).
Personnel Platform Usage Guidelines
A.
The aerial device shall not be used for other lifting operations while handling
personnel. Downhaul weight or load-block must be removed from loadline. The
loadline must be stowed on top of main boom. Anti-two-block switch must be
overridden.
B.
Upper and lower controls shall be tested and inspected daily prior to use.
C.
Only authorized persons shall operate the aerial device.
D.
Operator and any crewmembers on the ground shall be in constant communication.
E.
Boom and platform load ratings or work areas shall not be exceeded. Personnel in
the platform shall wear a body harness (fall protection device) that is securely
attached to the supplied lanyard attachment points at all times. Personnel in the
platform shall always stand firmly on the floor of the platform and not climb or sit on
the rails of the platform. Nor should personnel use planks, ladders or any other
materials for obtaining additional working height or reach.
F.
Belting off to structures other than the platform while on platform shall not be
permitted.
G.
The aerial device shall not be moved when
the boom is elevated. The aerial shall be
supported by a firm surface. Blocking may
be required to ensure that the load-bearing
surface can support the weight of aerial
operations. Provided outriggers shall be
properly extended and no lifting of
personnel is allowed when the aerial
device is supported by tires.
H.
The personnel platform and aerial device
are not insulated. Do not operate near power lines or electrical hazards.
MINIMUM CLEARANCE REQUIREMENTS
Minimum
Nominal Voltage kV
Distance
(Phase to Phase)
Required
Up to 50
10 feet
Over
50
10
feet
plus 1 foot for every 30 kV over 50
kV
Содержание E190
Страница 2: ......
Страница 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 140: ......
Страница 141: ......
Страница 146: ...TITLE...
Страница 147: ...TITLE...
Страница 149: ...TITLE...
Страница 150: ...TITLE...
Страница 151: ...TITLE...
Страница 152: ...TITLE...
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ...TITLE...
Страница 158: ...TITLE...
Страница 159: ...TITLE...
Страница 160: ...TITLE...
Страница 161: ...TITLE...
Страница 162: ...TITLE...
Страница 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Страница 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Страница 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Страница 227: ......
Страница 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Страница 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Страница 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Страница 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Страница 275: ...G SERVICE LITERATURE 52 60 SWING SERVICE LIT Sel 0007 DOC Rev 1 5200 SERIES 6000 SERIES SWING DRIVE SERVICE MANUAL...
Страница 279: ...4 5200S...
Страница 280: ...5 6000S...
Страница 287: ...Document number S071 Revision C Date 2011 10 17 Document type Manual SERVICE MANUAL Remote Control System RC400 G2B G3B...
Страница 333: ......
Страница 334: ......
Страница 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...