Five Section Boom Operation-aerial EEC-0080
V1.3
Five Section Boom Operation
F.
Inspect all zerks and grease paths in pins to ensure proper grease flow. Clean and
replace as required.
Five Section Boom Assembly
A.
Assemble sheaves into 5
th
section sheavecase. Top sheave is to be installed to the
left hand side of the boom with the spacer to the right hand side.
B.
Attach rear wear pads to the bottom of the 5
th
section. Using Loctite 242 blue, Loctite
all wear pad mounting capscrews.
C.
Position 5
th
section boom in front of the 4
th
section boom ready to slide together.
Route 3/4/5 extend cables through 4
th
section boom with the threaded end of the
cable at the rear of the 4
th
section and the button end out the front, loop the front
button end of the 3/4/5 cable beyond its anchor point on the 5
th
section and install
button end into 5
th
section boom.
D.
Install 5/4/3 retract cable button end into anchor point in 5
th
section and install
keeper plate and capscrews, keeper plate will lock both the extend and retract
cables in place. Coil 5/4/3 retract cables temporarily into 5
th
section.
4
th
Section Cable Anchor Cable Button Cable Thread
3/4/5 Extend
Содержание E190
Страница 2: ......
Страница 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 140: ......
Страница 141: ......
Страница 146: ...TITLE...
Страница 147: ...TITLE...
Страница 149: ...TITLE...
Страница 150: ...TITLE...
Страница 151: ...TITLE...
Страница 152: ...TITLE...
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ...TITLE...
Страница 158: ...TITLE...
Страница 159: ...TITLE...
Страница 160: ...TITLE...
Страница 161: ...TITLE...
Страница 162: ...TITLE...
Страница 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Страница 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Страница 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Страница 227: ......
Страница 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Страница 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Страница 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Страница 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Страница 275: ...G SERVICE LITERATURE 52 60 SWING SERVICE LIT Sel 0007 DOC Rev 1 5200 SERIES 6000 SERIES SWING DRIVE SERVICE MANUAL...
Страница 279: ...4 5200S...
Страница 280: ...5 6000S...
Страница 287: ...Document number S071 Revision C Date 2011 10 17 Document type Manual SERVICE MANUAL Remote Control System RC400 G2B G3B...
Страница 333: ......
Страница 334: ......
Страница 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...