Platform Safety-aerial EEC-0070
V1.3
Platform Safety
Recommended minimum working distances are to be maintained when working near
power lines or electrical hazards. Distances are based on voltages of electrical
hazards.
I.
If electrical voltage is unknown, assume maximum voltage and maintain the
maximum clearance of at least 45 feet.
J. Wind and Weather Conditions.
Before and during each use, the operator shall
measure wind speed from the aerial platform at the height of use with an
anemometer. Do not allow personnel lifts in wind speeds exceeding 20 miles per
hour (32 kilometers per hour) at the raised platform height when the platform is
attached to the jib. Do not allow personnel lifts in wind speeds exceeding 30 miles
per hour (48 kilometers per hour) at the raised platform height when the platform is
attached to the main boom. Winds aloft can be much stronger than at the ground.
Follow all applicable instructions for operating an anemometer. Weather can be
unpredictable, and the operator must determine prior to operation whether it is safe
to use the equipment given the conditions. Operators should be aware of high or
erratic winds, electric storms, snow, ice, sleet, or other adverse weather conditions
that could affect the safety of personnel or property. If high winds or adverse
weather conditions are encountered, do not use the equipment. If high winds or
adverse weather conditions develop, terminate the operation being
performed.
K.
Modification of the structural integrity of the personnel platform shall not be done
without written approval of the manufacturer.
L.
Personnel platforms are to be used only for personnel, their tools, and sufficient
materials for the workers to accomplish their job.
M.
Properly stow the personnel platform, jib, boom, and outriggers prior to road travel.
Special Work Considerations
Special precautions are to be taken for some, but not all, special work situations.
Содержание E190
Страница 2: ......
Страница 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 140: ......
Страница 141: ......
Страница 146: ...TITLE...
Страница 147: ...TITLE...
Страница 149: ...TITLE...
Страница 150: ...TITLE...
Страница 151: ...TITLE...
Страница 152: ...TITLE...
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ...TITLE...
Страница 158: ...TITLE...
Страница 159: ...TITLE...
Страница 160: ...TITLE...
Страница 161: ...TITLE...
Страница 162: ...TITLE...
Страница 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Страница 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Страница 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Страница 227: ......
Страница 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Страница 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Страница 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Страница 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Страница 275: ...G SERVICE LITERATURE 52 60 SWING SERVICE LIT Sel 0007 DOC Rev 1 5200 SERIES 6000 SERIES SWING DRIVE SERVICE MANUAL...
Страница 279: ...4 5200S...
Страница 280: ...5 6000S...
Страница 287: ...Document number S071 Revision C Date 2011 10 17 Document type Manual SERVICE MANUAL Remote Control System RC400 G2B G3B...
Страница 333: ......
Страница 334: ......
Страница 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...