![Elliott E190 Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/elliott/e190/e190_operation-and-maintenance-manual_2393840025.webp)
ANSI/SIA Weather EEC-0036
V1.2
Responsibilities per
ANSI/SIA A92.2
G. Bare-Hand Work:
For bare-hand work, a Category “A” aerial device shall be
used.
H.
Lower Controls:
The lower controls of aerial devices shall not be used for
continuous operation with personnel in the platform.
Responsibilities of Operators
A. General Responsibilities:
Each operator shall comply with the requirements of
this section.
B.
Operation:
During operation of the aerial device all platform occupants shall use
appropriate fall protection connected to the aerial device at the platform position.
C. Work Platform:
The operator shall not use railings, planks, ladders or any other
device in or on the work platform for achieving additional working height or reach.
D. Brakes:
The vehicle parking brake(s) shall be set at all times that the boom is
elevated except when the aerial device is being used in accordance with 9.5.
E. Loading:
Any loading which includes a horizontal load shall be avoided unless
the mobile unit is designed for that application.
F. Wind and Weather Conditions.
Before and during each use, the operator shall
measure wind speed from the aerial platform at the height of use with an
anemometer. Do not allow personnel lifts in wind speeds exceeding 30 miles per
hour (48 kilometers per hour) at the raised platform height. Winds aloft can be
much stronger than at the ground. Follow all applicable instructions for operating
an anemometer.
Weather can be unpredictable, and the operator must determine prior to
operation whether it is safe to use the equipment given the conditions. Operators
should be aware of high or erratic winds, electric storms, snow, ice, sleet, or
other adverse weather conditions that could affect the safety of personnel or
property. If high winds or adverse weather conditions are encountered, do not
use the equipment. If high winds or adverse weather conditions develop,
terminate the operation.
G. Observations:
Observations during operation for any defects shall be conducted
on an ongoing basis.
Содержание E190
Страница 2: ......
Страница 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 140: ......
Страница 141: ......
Страница 146: ...TITLE...
Страница 147: ...TITLE...
Страница 149: ...TITLE...
Страница 150: ...TITLE...
Страница 151: ...TITLE...
Страница 152: ...TITLE...
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ...TITLE...
Страница 158: ...TITLE...
Страница 159: ...TITLE...
Страница 160: ...TITLE...
Страница 161: ...TITLE...
Страница 162: ...TITLE...
Страница 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Страница 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Страница 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Страница 227: ......
Страница 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Страница 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Страница 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Страница 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Страница 275: ...G SERVICE LITERATURE 52 60 SWING SERVICE LIT Sel 0007 DOC Rev 1 5200 SERIES 6000 SERIES SWING DRIVE SERVICE MANUAL...
Страница 279: ...4 5200S...
Страница 280: ...5 6000S...
Страница 287: ...Document number S071 Revision C Date 2011 10 17 Document type Manual SERVICE MANUAL Remote Control System RC400 G2B G3B...
Страница 333: ......
Страница 334: ......
Страница 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...