Five Section Boom Operation-aerial EEC-0080
V1.3
Five Section Boom Operation
3/2/1 Retract Cable (Qty 2):
Connects to the front of the 1st (Main) section and
passes over sheave at back of 2nd (Next to Large) Section and Connects to Back of
3rd (Mid) Section. Primary function of these cables is to retract the 3rd (Mid) Section.
4/3/2 Retract Cable (Qty 2):
Connects to the front of the 2nd (Next to Large) section
and passes over sheave at back of 3rd (Mid) Section and Connects to Back of 4th
(Next to Tip) Section. Primary function of these cables is to retract the 4th (Next to
Tip) Section.
5/4/3 Retract Cable (Qty 2):
Connects to the front of the 3rd (Mid) section and
passes over sheave at back of 4th (Next to Tip) Section and Connects to Back of 5th
(Tip) Section. Primary function of these cables is to retract the 5th (Tip) Section.
3/4/5 Extend Cable (Qty 2):
Connects to the back of the 3rd (Mid) section and
passes over sheave at front of 4th (Next to Tip) Section and Connects to Back of 5th
(Tip) Section. Primary function of these cables is to extend the 5th (Tip) Section.
2/3/4 Extend Cable (Qty 3):
Connects to the back of the 2nd (Next to Large) section
and passes over sheave on the extension cylinder and Connects to Back of 4th
(Next to Tip) Section. Primary function of these cables is to extend the 4th (Next to
tip) Section.
1/2/3 Extend Cable/ Proportioning Cable (Qty 2):
Connects to the back of the 1st
(Main) section and passes over sheave at front (on top) of 2nd (Next to Large)
Section and Connects to Back of 3rd (Mid) Section. Primary function of these
cables is to synchronize the telescope cylinder/boom.
Extension Cylinder - Two Stage (Qty 1):
Connects to the back of the 1st (Main)
section, Back of the 2nd (Next to Large), and 3rd (Mid) Sections. Primary Function
of the cylinder is to extend & retract the sections 1, 2 & 3 (Main, Next to Large, &
Mid).
Содержание E190
Страница 2: ......
Страница 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 140: ......
Страница 141: ......
Страница 146: ...TITLE...
Страница 147: ...TITLE...
Страница 149: ...TITLE...
Страница 150: ...TITLE...
Страница 151: ...TITLE...
Страница 152: ...TITLE...
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ...TITLE...
Страница 158: ...TITLE...
Страница 159: ...TITLE...
Страница 160: ...TITLE...
Страница 161: ...TITLE...
Страница 162: ...TITLE...
Страница 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Страница 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Страница 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Страница 227: ......
Страница 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Страница 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Страница 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Страница 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Страница 275: ...G SERVICE LITERATURE 52 60 SWING SERVICE LIT Sel 0007 DOC Rev 1 5200 SERIES 6000 SERIES SWING DRIVE SERVICE MANUAL...
Страница 279: ...4 5200S...
Страница 280: ...5 6000S...
Страница 287: ...Document number S071 Revision C Date 2011 10 17 Document type Manual SERVICE MANUAL Remote Control System RC400 G2B G3B...
Страница 333: ......
Страница 334: ......
Страница 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...