Five Section Boom Operation-aerial EEC-0080
V1.3
Five Section Boom Operation
D.
Torque the 5/4/3 retract cables to ft-lb (8.13 N.m) each. Use the flats at the front of
the cable ends to keep the cables from rotating while torqueing. These cables are
located at the bottom tip of the 3
rd
section boom.
E.
Torque the 3/4/5 extend cables to 15 ft-lb (20.37 N.m) each. These cables are
located at the top base of the 3
rd
stage boom. (
Reference Step C for access to the
3/4/5 extend cables.
)
F.
Torque the 4/3/2 retract cables to 7 ft-lb (9.5 N.m). Use the flats at the front of the
cable ends to keep the cables from rotating while torqueing. These cables are
located at the bottom tip of the 2
nd
section boom.
G.
Torque the 2/3/4 extend cables to 20 ft-lb (27 N.m) each. These cables are located
at the top base of the 2
nd
section boom. (Reference
step C
for access to the 2/3/4
extend cables).
H.
Torque the 3/2/1 retract cables to the 9ft-lb (12 N.m). Use the flats at the front of the
cable ends to keep the cables from rotating while torqueing. These cables are
located at the bottom tip of the 1
st
section boom.
3/4/5 Extend Cables
5/4/3 Retract Cables
1
st
Section 2
nd
Section 3
rd
Section 4
th
Section 5
th
Section
Содержание E190
Страница 2: ......
Страница 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 140: ......
Страница 141: ......
Страница 146: ...TITLE...
Страница 147: ...TITLE...
Страница 149: ...TITLE...
Страница 150: ...TITLE...
Страница 151: ...TITLE...
Страница 152: ...TITLE...
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ...TITLE...
Страница 158: ...TITLE...
Страница 159: ...TITLE...
Страница 160: ...TITLE...
Страница 161: ...TITLE...
Страница 162: ...TITLE...
Страница 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Страница 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Страница 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Страница 227: ......
Страница 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Страница 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Страница 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Страница 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Страница 275: ...G SERVICE LITERATURE 52 60 SWING SERVICE LIT Sel 0007 DOC Rev 1 5200 SERIES 6000 SERIES SWING DRIVE SERVICE MANUAL...
Страница 279: ...4 5200S...
Страница 280: ...5 6000S...
Страница 287: ...Document number S071 Revision C Date 2011 10 17 Document type Manual SERVICE MANUAL Remote Control System RC400 G2B G3B...
Страница 333: ......
Страница 334: ......
Страница 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...