Five Section Boom Operation-aerial EEC-0080
V1.3
Five Section Boom Operation
their approximate location as the cylinder is installed into the 5
th
/4
th
/3
rd
boom
assembly.
CC.
Slide extend cylinder into the 3
rd
-4
th
-5
th
boom assembly approximately 36 inches
(90cm). Raise cylinder up at an angle slightly to allow easier access to the 2/3/4
extend cable anchor in the rear of the 4
th
section. Install 2/3/4 extend cable anchor
and cable ends into the anchor point. Install keeper plates over the retract cable
ends these keepers are shaped to retain the 2/3/4 anchor as well as the retract
cable ends. Tighten capscrews holding the two halves of the 2/3/4 anchor assembly
together.
DD.
Lower extend cylinder to a position parallel with the 3
rd
/4
th
/5
th
boom assembly
and slowly push the cylinder into the 3
rd
/4
th
/5
th
boom assembly until the cylinder
collar makes contact with the 3
rd
section rear vertical doubler plates. Monitor 2/3/4
extend cable location as cylinder slides into boom sections to avoid damaging
cables.
EE.
Raise extend cylinder up to allow cylinder collar to slide through and align with
the anchor pocket on the back of the 3
rd
, lower cylinder, collar will move down into
cylinder anchor pocket, if properly positioned over pocket. Assemble lock bar and
proper hardware to the cylinder collar, this will retain the cylinder into the anchor
pocket.
FF.
Attach button end of 1/2/3 small extend cables into anchor point on the rear top
plate of the 3
rd
section, a thin plate on the bottom and a thicker anchor plate on the
top of the 3
rd
section top are required for proper cable retention, assemble with
proper hardware and Loctite 242.
GG.
Lay 1/2/3 extend cables on the top of the 3
rd
section with the proper sheaves and
pins that eventually will attach to the top plate of the 2
nd
section. Arrange the cables.
HH.
The 3
rd
/4
th
/5
th
and cylinder assembly is now ready to assemble into the 2
nd
section boom.
II.
Slide 3
rd
/4
th
/5
th
and cylinder assembly is now ready to assemble into the 2
nd
section boom approximately 36 inches (90cm) keep the 3
rd
/4
th
/5
th
and cylinder
assembly suspended to avoid damage to the 4/3/2 retract cables. Assemble bottom
Содержание E190
Страница 2: ......
Страница 64: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 72: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 75: ...Hirschmann J1939 Install EEC 0110 V1 0 Hirschmann J1939 Network Installation...
Страница 140: ......
Страница 141: ......
Страница 146: ...TITLE...
Страница 147: ...TITLE...
Страница 149: ...TITLE...
Страница 150: ...TITLE...
Страница 151: ...TITLE...
Страница 152: ...TITLE...
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ...TITLE...
Страница 158: ...TITLE...
Страница 159: ...TITLE...
Страница 160: ...TITLE...
Страница 161: ...TITLE...
Страница 162: ...TITLE...
Страница 173: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Страница 179: ...Four Section Boom Operation aerial EEC 0081 V1 3 Four Section Boom Operation...
Страница 199: ...Five Section Boom Operation aerial EEC 0080 V1 3 Five Section Boom Operation...
Страница 227: ......
Страница 230: ...1 INFORMAZIONI GENERALI GENERAL INFORMATION...
Страница 248: ...8 ACCESSORI PER ARGANI DA SOLLEVAMENTO E TRAINO LIFTING AND RECOVERY WINCH ACCESSORIES...
Страница 265: ...11 TABELLE DI CONVERSIONE CONVERSION TABLES...
Страница 268: ...12 CONDIZIONI GENERALI DI VENDITA CONDITIONS OF SALE...
Страница 275: ...G SERVICE LITERATURE 52 60 SWING SERVICE LIT Sel 0007 DOC Rev 1 5200 SERIES 6000 SERIES SWING DRIVE SERVICE MANUAL...
Страница 279: ...4 5200S...
Страница 280: ...5 6000S...
Страница 287: ...Document number S071 Revision C Date 2011 10 17 Document type Manual SERVICE MANUAL Remote Control System RC400 G2B G3B...
Страница 333: ......
Страница 334: ......
Страница 357: ...Appendix B Parts Index ELLIOTT Built for You E190 Manual B 1...